Production & Industrial Engineering

Work Systems and Facility Design

Method study, time study, ergonomics, plant layout, line balancing.

Interview questionsFormula sheet
Your progress in this subject0 of 15 · 0%
  1. 1Productivity and its measurementPartial, multi-factor and total productivity, productivity indices, the ILO work-content model, and why inputs must be valued at base-period prices.
  2. 2Method study: recording techniques and chartsSREDIM steps, the questioning technique, ASME symbols, process charts, man-machine and SIMO charts, and flow and string diagrams, with a machines-per-operator calculation.
  3. 3Principles of motion economyBarnes's principles of motion economy in three groups, classes of movement, normal and maximum working areas, and effective vs ineffective therbligs.
  4. 4Time study and standard timeStopwatch time study from elements to standard time: rating, allowances on normal time vs on the working day, and the number of cycles for a given confidence and accuracy.
  5. 5Work samplingRandom-observation work sampling: the binomial basis, absolute vs relative accuracy, number of observations, utilisation and standard time from a sampling study.
  6. 6Predetermined motion time systems: MTM and MOSTHow MTM-1 and BasicMOST build normal times from tabulated motion data, TMU conversions, MOST sequence models and the × 10 rule, with standard time and output.
  7. 7Ergonomics: anthropometry and workplace designAnthropometric percentiles, design for extremes, adjustable range and average, workstation height and reach rules, and the revised NIOSH lifting equation.
  8. 8Work environment: lighting, noise and heatLighting units and the lumen method, decibel addition, distance attenuation and noise dose, and heat stress with the WBGT index.
  9. 9Wage incentive plans and job evaluationJob evaluation methods and individual and group incentive plans, with Halsey, Rowan and standard hour earnings and a point-method wage line.
  10. 10Plant location: factor rating and break-even methodsLocation factors and the factor rating, location break-even and centre-of-gravity methods, with a three-site cost-volume comparison.
  11. 11Plant layout types: process, product, cellularProcess, product, fixed-position and cellular layouts, when each fits, machine requirement calculations and rank order clustering for forming cells.
  12. 12Layout design: CRAFT and systematic layout planningMuther's Systematic Layout Planning with closeness ratings, construction vs improvement algorithms, and a worked CRAFT pairwise-exchange iteration.
  13. 13Assembly line balancingTakt time, minimum stations, line efficiency, balance delay and smoothness index, with the largest candidate, Kilbridge–Wester and RPW heuristics worked on a precedence network.
  14. 14Material handling principles and equipmentThe ten principles of material handling, equipment classes and selection, and conveyor and vehicle fleet sizing calculations.
  15. 15Industrial safety and accident preventionCauses of accidents, the domino theory and accident pyramid, the hierarchy of controls, machine guarding, Indian legal framework, and frequency and severity rates.