Production & Industrial Engineering
Work Systems and Facility Design
Method study, time study, ergonomics, plant layout, line balancing.
Your progress in this subject0 of 15 · 0%
- 1Productivity and its measurementPartial, multi-factor and total productivity, productivity indices, the ILO work-content model, and why inputs must be valued at base-period prices.
- 2Method study: recording techniques and chartsSREDIM steps, the questioning technique, ASME symbols, process charts, man-machine and SIMO charts, and flow and string diagrams, with a machines-per-operator calculation.
- 3Principles of motion economyBarnes's principles of motion economy in three groups, classes of movement, normal and maximum working areas, and effective vs ineffective therbligs.
- 4Time study and standard timeStopwatch time study from elements to standard time: rating, allowances on normal time vs on the working day, and the number of cycles for a given confidence and accuracy.
- 5Work samplingRandom-observation work sampling: the binomial basis, absolute vs relative accuracy, number of observations, utilisation and standard time from a sampling study.
- 6Predetermined motion time systems: MTM and MOSTHow MTM-1 and BasicMOST build normal times from tabulated motion data, TMU conversions, MOST sequence models and the × 10 rule, with standard time and output.
- 7Ergonomics: anthropometry and workplace designAnthropometric percentiles, design for extremes, adjustable range and average, workstation height and reach rules, and the revised NIOSH lifting equation.
- 8Work environment: lighting, noise and heatLighting units and the lumen method, decibel addition, distance attenuation and noise dose, and heat stress with the WBGT index.
- 9Wage incentive plans and job evaluationJob evaluation methods and individual and group incentive plans, with Halsey, Rowan and standard hour earnings and a point-method wage line.
- 10Plant location: factor rating and break-even methodsLocation factors and the factor rating, location break-even and centre-of-gravity methods, with a three-site cost-volume comparison.
- 11Plant layout types: process, product, cellularProcess, product, fixed-position and cellular layouts, when each fits, machine requirement calculations and rank order clustering for forming cells.
- 12Layout design: CRAFT and systematic layout planningMuther's Systematic Layout Planning with closeness ratings, construction vs improvement algorithms, and a worked CRAFT pairwise-exchange iteration.
- 13Assembly line balancingTakt time, minimum stations, line efficiency, balance delay and smoothness index, with the largest candidate, Kilbridge–Wester and RPW heuristics worked on a precedence network.
- 14Material handling principles and equipmentThe ten principles of material handling, equipment classes and selection, and conveyor and vehicle fleet sizing calculations.
- 15Industrial safety and accident preventionCauses of accidents, the domino theory and accident pyramid, the hierarchy of controls, machine guarding, Indian legal framework, and frequency and severity rates.