Work Systems and Facility Design — formula sheet

Production & Industrial Engineering · GATE PI · SI units. Drafted with Aria, checked by the AiCanCode.org team.

Productivity and its measurement

  • Partial productivity = O / I_k — O = output (units or ₹ at base-period prices), I_k = one input (labour-h, machine-h, kg, kWh or ₹); e.g. labour productivity in units per labour-hour.
  • Total productivity TP = O_T / (H + M + C + E + X) — all output and inputs (human, material, capital, energy, other) in ₹ at base-period prices; dimensionless. Never add hours to rupees.
  • PI = P_current / P_base; % change = (PI − 1) × 100 — productivity index; same measure and price base in both periods.

Method study: recording techniques and charts

  • n′ = (a + t) / (a + b) — ideal machines per operator; a = concurrent load/unload time, t = automatic machine time, b = independent operator time per machine (walk, inspect), all in min.
  • T_c = a + t (n ≤ n′); T_c = n(a + b) (n > n′) — cycle time of an n-machine assignment, min.
  • Operator utilisation = n(a + b) / T_c; Machine utilisation = (a + t) / T_c — fractions.

Principles of motion economy

  • Output per hour = 3600 × k / t_c — t_c = cycle time (s), k = units completed per cycle (2 when both hands each complete a unit).

Time study and standard time

  • NT = OT × R / 100 — normal (basic) time from observed time OT (min) and performance rating R (%, standard = 100).
  • ST = NT × (1 + A) — standard time when allowance A is a fraction of normal time.
  • ST = NT / (1 − A) — standard time when A is a fraction of total working time.
  • N′ = [40 √(nΣx² − (Σx)²) / Σx]² — readings needed for 95 % confidence, ±5 % accuracy from n trial readings x; general form N′ = (z·s / (k·x̄))². Round up.

Work sampling

  • p = n / N — proportion of observations showing the activity.
  • N = z² p(1 − p) / E² — observations for absolute accuracy E (fraction); z = 1.96 (95 %), 1.645 (90 %), often 2.
  • N = z² (1 − p) / (s² p) — observations for relative accuracy s (fraction of p).
  • NT = T × p_w × R / Q; ST = NT × (1 + A) — normal and standard time per unit from a sampling study; T = study time (min), p_w = working proportion, R = rating (fraction), Q = units produced.

Predetermined motion time systems: MTM and MOST

  • 1 TMU = 0.00001 h = 0.0006 min = 0.036 s — time measurement unit.
  • BasicMOST time (TMU) = 10 × Σ index values × frequency — e.g. general move A B G A B P A; MiniMOST multiplier 1, MaxiMOST 100.
  • ST = NT × (1 + A) — PMTS times are normal times (no rating); add allowances.

Ergonomics: anthropometry and workplace design

  • X_p = μ + z·σ — p-th percentile of a body dimension; z = −1.645 (5th), +1.645 (95th), ±2.326 (1st/99th). Clearances use a large user (95th), reaches a small user (5th).
  • RWL = 23 × (25/H) × (1 − 0.003|V − 75|) × (0.82 + 4.5/D) × (1 − 0.0032A) × FM × CM — revised NIOSH recommended weight limit in kg; H, V, D in cm, A in degrees; FM, CM from tables.
  • LI = L / RWL — lifting index; LI > 1 means increased risk.

Work environment: lighting, noise and heat

  • E = Φ / A — illuminance (lux) from flux reaching the plane (lm) over area (m²).
  • N = E × A / (Φ_L × UF × MF) — luminaires needed (lumen method); round up.
  • E = I cos θ / d² — point source; I in cd, d in m.
  • L = 10 log₁₀(I / 10⁻¹²); L = 20 log₁₀(p / 20 µPa) — sound level in dB.
  • L_total = 10 log₁₀ Σ 10^(L_i/10) — combining sources; two equal sources give +3 dB.
  • L₂ = L₁ − 20 log₁₀(r₂ / r₁) — point source, free field (−6 dB per doubling of distance).
  • T = 8 / 2^((L − 90)/5); D = Σ C_i / T_i ≤ 1 — permissible hours at L dB(A) (90 dB(A), 5 dB exchange) and daily noise dose.
  • WBGT = 0.7 T_nwb + 0.3 T_g (indoor); 0.7 T_nwb + 0.2 T_g + 0.1 T_db (outdoor in sun) — °C.

Wage incentive plans and job evaluation

  • Halsey: E = T·R + p(S − T)·R — S = standard time, T = actual time (h), R = rate (₹/h), p = 0.5 or 1/3.
  • Rowan: E = T·R + [(S − T)/S]·T·R — bonus is largest at T = S/2 (bonus = S·R/4).
  • Standard hour plan: E = S·R — when T < S; time wage T·R is guaranteed.
  • W = W₁ + (W₂ − W₁)(P − P₁)/(P₂ − P₁) — point-method wage line through two benchmark jobs.

Plant location: factor rating and break-even methods

  • S_j = Σ w_i s_ij — weighted factor score of site j; Σ w_i = 1.
  • TC_j = F_j + v_j Q — total annual cost of site j; F = fixed cost (₹/yr), v = variable cost (₹/unit), Q = volume (units/yr).
  • Q* = (F_B − F_A) / (v_A − v_B) — crossover volume between two sites; above Q* the site with lower v is cheaper.
  • x̄ = Σ x_i V_i / Σ V_i, ȳ = Σ y_i V_i / Σ V_i — centre-of-gravity location.

Plant layout types: process, product, cellular

  • N = (D × t) / (T × η), with D = D_good / (1 − s) — machines required; t = standard time (min/part), T = available time per machine (min), η = efficiency, s = scrap fraction. Round up.

Layout design: CRAFT and systematic layout planning

  • TC = Σ f_ij c_ij d_ij — total handling cost; f = loads per period, c = cost per load per metre, d = centroid distance (m).
  • d_ij = |x_i − x_j| + |y_i − y_j| — rectilinear distance between centroids.

Assembly line balancing

  • C = Available time / Required output — takt (design cycle) time.
  • N_min = ⌈Σ t_i / C⌉ — theoretical minimum stations.
  • η = Σ t_i / (n × C); d = 1 − η — line efficiency and balance delay; n = actual stations, C = cycle time (use the largest station time for the actual cycle).
  • SI = √Σ (S_max − S_k)² — smoothness index.
  • RPW_i = t_i + Σ t_j (all followers j of i) — ranked positional weight.

Material handling principles and equipment

  • R_f = v_c / s_p — conveyor flow rate (parts per unit time); v_c = speed, s_p = part spacing.
  • T_c = T_L + L_d / v + T_U + L_e / v — vehicle delivery cycle (min); L_d loaded, L_e empty distance (m), v speed (m/min).
  • n = R_f × T_c / (60 × A × T_f) — vehicles needed (round up); R_f = deliveries per hour, A = availability, T_f = traffic factor.

Industrial safety and accident prevention

  • FR = Lost-time injuries × 10⁶ / Man-hours worked — frequency rate.
  • SR = Man-days lost × 10⁶ / Man-hours worked — severity rate; includes standard charges for deaths and disabilities (IS 3786).
  • FSI = √(FR × SR / 1000) — frequency–severity index.
  • IR = Injuries × 1000 / Average number of workers — incidence rate.