Productivity and its measurement
Partial productivity = O / I_k— O = output (units or ₹ at base-period prices), I_k = one input (labour-h, machine-h, kg, kWh or ₹); e.g. labour productivity in units per labour-hour.Total productivity TP = O_T / (H + M + C + E + X)— all output and inputs (human, material, capital, energy, other) in ₹ at base-period prices; dimensionless. Never add hours to rupees.PI = P_current / P_base;% change = (PI − 1) × 100— productivity index; same measure and price base in both periods.
Method study: recording techniques and charts
n′ = (a + t) / (a + b)— ideal machines per operator; a = concurrent load/unload time, t = automatic machine time, b = independent operator time per machine (walk, inspect), all in min.T_c = a + t (n ≤ n′);T_c = n(a + b) (n > n′)— cycle time of an n-machine assignment, min.Operator utilisation = n(a + b) / T_c;Machine utilisation = (a + t) / T_c— fractions.
Principles of motion economy
Output per hour = 3600 × k / t_c— t_c = cycle time (s), k = units completed per cycle (2 when both hands each complete a unit).
Time study and standard time
NT = OT × R / 100— normal (basic) time from observed time OT (min) and performance rating R (%, standard = 100).ST = NT × (1 + A)— standard time when allowance A is a fraction of normal time.ST = NT / (1 − A)— standard time when A is a fraction of total working time.N′ = [40 √(nΣx² − (Σx)²) / Σx]²— readings needed for 95 % confidence, ±5 % accuracy from n trial readings x; general formN′ = (z·s / (k·x̄))². Round up.
Work sampling
p = n / N— proportion of observations showing the activity.N = z² p(1 − p) / E²— observations for absolute accuracy E (fraction); z = 1.96 (95 %), 1.645 (90 %), often 2.N = z² (1 − p) / (s² p)— observations for relative accuracy s (fraction of p).NT = T × p_w × R / Q;ST = NT × (1 + A)— normal and standard time per unit from a sampling study; T = study time (min), p_w = working proportion, R = rating (fraction), Q = units produced.
Predetermined motion time systems: MTM and MOST
1 TMU = 0.00001 h = 0.0006 min = 0.036 s— time measurement unit.BasicMOST time (TMU) = 10 × Σ index values × frequency— e.g. general move A B G A B P A; MiniMOST multiplier 1, MaxiMOST 100.ST = NT × (1 + A)— PMTS times are normal times (no rating); add allowances.
Ergonomics: anthropometry and workplace design
X_p = μ + z·σ— p-th percentile of a body dimension; z = −1.645 (5th), +1.645 (95th), ±2.326 (1st/99th). Clearances use a large user (95th), reaches a small user (5th).RWL = 23 × (25/H) × (1 − 0.003|V − 75|) × (0.82 + 4.5/D) × (1 − 0.0032A) × FM × CM— revised NIOSH recommended weight limit in kg; H, V, D in cm, A in degrees; FM, CM from tables.LI = L / RWL— lifting index; LI > 1 means increased risk.
Work environment: lighting, noise and heat
E = Φ / A— illuminance (lux) from flux reaching the plane (lm) over area (m²).N = E × A / (Φ_L × UF × MF)— luminaires needed (lumen method); round up.E = I cos θ / d²— point source; I in cd, d in m.L = 10 log₁₀(I / 10⁻¹²);L = 20 log₁₀(p / 20 µPa)— sound level in dB.L_total = 10 log₁₀ Σ 10^(L_i/10)— combining sources; two equal sources give +3 dB.L₂ = L₁ − 20 log₁₀(r₂ / r₁)— point source, free field (−6 dB per doubling of distance).T = 8 / 2^((L − 90)/5);D = Σ C_i / T_i ≤ 1— permissible hours at L dB(A) (90 dB(A), 5 dB exchange) and daily noise dose.WBGT = 0.7 T_nwb + 0.3 T_g(indoor);0.7 T_nwb + 0.2 T_g + 0.1 T_db(outdoor in sun) — °C.
Wage incentive plans and job evaluation
Halsey: E = T·R + p(S − T)·R— S = standard time, T = actual time (h), R = rate (₹/h), p = 0.5 or 1/3.Rowan: E = T·R + [(S − T)/S]·T·R— bonus is largest at T = S/2 (bonus = S·R/4).Standard hour plan: E = S·R— when T < S; time wage T·R is guaranteed.W = W₁ + (W₂ − W₁)(P − P₁)/(P₂ − P₁)— point-method wage line through two benchmark jobs.
Plant location: factor rating and break-even methods
S_j = Σ w_i s_ij— weighted factor score of site j; Σ w_i = 1.TC_j = F_j + v_j Q— total annual cost of site j; F = fixed cost (₹/yr), v = variable cost (₹/unit), Q = volume (units/yr).Q* = (F_B − F_A) / (v_A − v_B)— crossover volume between two sites; above Q* the site with lower v is cheaper.x̄ = Σ x_i V_i / Σ V_i,ȳ = Σ y_i V_i / Σ V_i— centre-of-gravity location.
Plant layout types: process, product, cellular
N = (D × t) / (T × η), withD = D_good / (1 − s)— machines required; t = standard time (min/part), T = available time per machine (min), η = efficiency, s = scrap fraction. Round up.
Layout design: CRAFT and systematic layout planning
TC = Σ f_ij c_ij d_ij— total handling cost; f = loads per period, c = cost per load per metre, d = centroid distance (m).d_ij = |x_i − x_j| + |y_i − y_j|— rectilinear distance between centroids.
Assembly line balancing
C = Available time / Required output— takt (design cycle) time.N_min = ⌈Σ t_i / C⌉— theoretical minimum stations.η = Σ t_i / (n × C);d = 1 − η— line efficiency and balance delay; n = actual stations, C = cycle time (use the largest station time for the actual cycle).SI = √Σ (S_max − S_k)²— smoothness index.RPW_i = t_i + Σ t_j (all followers j of i)— ranked positional weight.
Material handling principles and equipment
R_f = v_c / s_p— conveyor flow rate (parts per unit time); v_c = speed, s_p = part spacing.T_c = T_L + L_d / v + T_U + L_e / v— vehicle delivery cycle (min); L_d loaded, L_e empty distance (m), v speed (m/min).n = R_f × T_c / (60 × A × T_f)— vehicles needed (round up); R_f = deliveries per hour, A = availability, T_f = traffic factor.
Industrial safety and accident prevention
FR = Lost-time injuries × 10⁶ / Man-hours worked— frequency rate.SR = Man-days lost × 10⁶ / Man-hours worked— severity rate; includes standard charges for deaths and disabilities (IS 3786).FSI = √(FR × SR / 1000)— frequency–severity index.IR = Injuries × 1000 / Average number of workers— incidence rate.