RTMNU Final Electrical syllabus

RTMNU · Final Year B.Tech Electrical Engineering · CBCS

Electrical Installation Design

BTCHEE702T · Professional Elective IV · Semester VII · 3 credits · College 30 + university 70

One of the Professional Elective IV options.

  1. Unit 1: Electrical Load Assessment; Cables, Conductors and Bus-bars

    8 hours

    Load categories, connected load, demand, diversity, load and power factors, TOD tariffs and industrial bills; construction, selection, installation and ratings of cables, bus-bars and overhead conductors.

    Examined in the 70-mark end-semester paper

    • Load estimation: load and diversity factors
    • Power factor, TOD and kVAh tariffs
    • Electricity billing
    • Cable selection and sizing
    • Bus bar design
    • Conductor sizing for overhead lines with ACSR
  2. Unit 2: Switching and Protection Devices; Short-Circuit Calculations

    7 hours

    Specification and selection of isolators, switch-fuse units, MCB, ELCB, MCCB, ACB, VCB and SF6 breakers, and symmetrical short-circuit currents for breaker ratings and series reactors.

    Examined in the 70-mark end-semester paper

    • HT and LT switchgear selection
    • Miniature circuit breakers
    • Fuses and protective devices in installations
    • Symmetrical fault calculation and short-circuit MVA
    • Current-limiting reactors
  3. Unit 3: Supply to Induction Motors; Reactive Power Management

    7 hours

    Motor types, single-line diagrams of DOL, star-delta and autotransformer starters, reactive power compensation with static capacitors, and the payback period of capacitor investment.

    Examined in the 70-mark end-semester paper

    • Motor starting and control circuits
    • Power factor improvement and capacitor placement
    • Payback, ROI and net present value
  4. Unit 4: Design of Industrial Electrical Installations

    7 hours

    Preparing the load list, selecting transformers, bus-bars, cables, switchgear, protective devices and the earthing system, and testing and commissioning.

    Examined in the 70-mark end-semester paper

    • Electrical installations for commercial buildings and small industries
    • Transformer selection and sizing
    • Protection coordination and discrimination
    • Earthing design
    • Testing and commissioning of industrial installations
  5. Unit 5: Substations

    7 hours

    11 kV and 33 kV indoor and outdoor substations, plans and elevations, earthing arrangements and their measurement, and IE Rules for residential, commercial and industrial installations.

    Examined in the 70-mark end-semester paper

    • Types of substations and their equipment
    • Outdoor substation single-line diagram and estimate
    • Indoor floor-mounted substation design
    • Earth resistance testing methods
    • IE Rules for electrical installations

Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).