Electrical Distribution System

BTCHEE802T · Professional Elective VI · Semester VIII · 3 credits · College 30 + university 70

One of the Professional Elective VI options.

  1. Unit 1: Introduction and General Concepts

    6 hours

    Distribution systems, load modelling and characteristics, coincidence, contribution and loss factors and the load-factor/loss-factor relation, and residential, commercial, agricultural and industrial loads.

    Examined in the 70-mark end-semester paper

    • Comparison of supply systems
    • Load models: voltage and frequency dependence
    • Load curves and load factors
    • Coincidence, contribution and loss factors
  2. Unit 2: Distribution Feeders and Substations

    7 hours

    Radial and loop primary feeders, voltage levels and loading, secondary distribution design, distribution substation ratings and service areas, optimal substation location and layout.

    Examined in the 70-mark end-semester paper

    • Primary and secondary distribution
    • Distribution feeders
    • Substation classification and equipment
    • Optimal location and rating of distribution substations
  3. Unit 3: Distribution System Analysis

    8 hours

    Voltage drop and power loss in lines, manual solution of radial networks, and three-phase balanced primary lines.

    Examined in the 70-mark end-semester paper

    • Voltage drop in AC distributors
    • Power loss calculations in radial feeders
  4. Unit 4: Protective Devices and Automation

    7 hours

    Distribution protection objectives, common faults and fault calculation, fuses, reclosers, sectionalisers and circuit breakers, and distribution automation with data acquisition and decentralised control.

    Examined in the 70-mark end-semester paper

    • Reclosers, sectionalisers and fuses in distribution protection
    • Substation and feeder automation
    • Distribution automation and data acquisition
  5. Unit 5: Voltage Control and Power Factor Improvement

    8 hours

    Voltage control equipment, series capacitors, line drop compensation, AVB/AVR, fixed and switched shunt capacitors, and the economics and best location of capacitors.

    Examined in the 70-mark end-semester paper

    • Series and shunt compensation
    • Line drop compensation and voltage regulators
    • Power factor improvement and capacitor placement