PAHSU · Final Year B.Tech. Electrical Engineering · NEP 2020
Electrical Estimation, Installation, and Testing
EEPEC-04A · Programme Elective IV · Semester VII · 4 credits · End-semester 100 only
One of the Programme Elective IV options. A self-learning course (4 hours a week) examined only by a 100-mark end-semester exam.
Unit 1: Safety and Prevention of Accidents
8 hoursSafety terminology; the Indian Electricity Act and statutory regulations; IS and IEC safety standards; do's and don'ts for substation operators; causes of electrical accidents and factors in shock severity; rescue and artificial respiration; preventing electrical fires and using extinguishers.
Examined in the 100-mark end-semester paper
- Principles of electrical safety and accident prevention
- The Electricity Act, 2003
- Medical effects of electric shock
- IE Rules on first aid and firefighting
Unit 2: Estimating and Conductor Size Calculations
8 hoursPurpose and steps of estimating, price catalogues and schedules of rates; conductor size by current capacity, voltage drop, temperature rise and minimum size per IS/IEC; sizing for domestic wiring, underground cables and ACSR overhead lines.
Examined in the 100-mark end-semester paper
- Principles of estimating and costing
- Cable and conductor sizing
- Current-carrying capacity and grouping of cables
- Permissible voltage drop for lighting and industrial loads
- Estimating residential and commercial wiring
- Conductor sizing for overhead lines with ACSR
Unit 3: Electrical Installation
8 hoursDesigning machine foundations and their dimensions; levelling and aligning shafts of direct and indirect drives and the effects of misalignment; installing rotating machines per IS 900 and IEC; purpose of earthing, pipe and plate earthing.
Examined in the 100-mark end-semester paper
- Machine foundations, levelling and shaft alignment
- Equipment and neutral earthing
- Earth electrodes and earth resistance
Unit 4: Testing of Rotating Machines, Transformer, and Insulation
10 hoursPurpose of testing and IS/IEC standards; pre-commissioning tests; routine, type, special and supplementary tests on transformers and rotating machines; induced over-voltage and impulse withstand tests; insulation classes and the life of insulation; transformer oil, its contaminants and the acidity, flash point, crackle, sludge and dielectric strength tests.
Examined in the 100-mark end-semester paper
- Type, routine and special tests on transformers
- Heat run and high-voltage withstand tests
- Transformer oil testing and reconditioning
Unit 5: Maintenance of Rotating Machines, Transformer and Insulation
7 hoursRoutine, preventive and breakdown maintenance compared; developing a preventive maintenance schedule and what affects it; total productive maintenance; routine and preventive maintenance of transformers.
Examined in the 100-mark end-semester paper
- Maintenance strategies
- Preventive maintenance of transformers and motors
- Insulation deterioration and polarisation index
Unit 6: Electrical Insulation
7 hoursRequirements and types of solid, liquid and gaseous insulation and their uses; thermal classes Y to C; dielectric strength, loss and constant; breakdown in solid, liquid and gas insulation; insulation resistance with a megger and dielectric strength tests.
Examined in the 100-mark end-semester paper
- Insulating materials in power apparatus
- Temperature rise and rating of machines
- Breakdown in solid dielectrics
- Insulation resistance testing
Unit contents are summarised from the official PAHSU syllabus . AiCanCode.org is not affiliated with Punyashlok Ahilyadevi Holkar Solapur University (PAHSU).