SPPU TE Electrical syllabus

SPPU · Third Year Electrical Engineering · 2024 Pattern

Electrical Installation, Design & Condition Based Maintenance

PCC-303-ELE · Semester V · 3 credits · CCE 30 + end-semester 70

All notes for this subject
  1. Unit 1: Economics of Distribution Systems

    8 hours

    DC two-wire and single- and three-phase AC supply systems compared on conductor volume, overhead versus underground; primary and secondary distribution; voltage drop in uniformly and non-uniformly loaded distributors; Kelvin's law; radial and ring feeders and feeder losses.

    Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)

    • Comparison of supply systems
    • Primary and secondary distribution
    • Voltage drop in AC distributors
    • Kelvin's law
    • Distribution feeders
  2. Unit 2: Substations and Earthing

    8 hours

    Classification of substations and their equipment; single, sectionalised and main-and-transfer bus bars; equipment and neutral earthing; maintenance-free earthing; earth resistance testing, plate and pipe electrodes; step and touch voltages; substation earthing grid design to IEEE 80-2013.

    Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)

    • Substation classification and equipment
    • Bus bar arrangements
    • Equipment and neutral earthing
    • Earth electrodes and earth resistance
    • Step and touch voltages
    • Substation earthing grid design
  3. Unit 3: Maintenance and Condition Monitoring

    8 hours

    Breakdown, preventive and condition-based maintenance; maintaining transformers, induction motors and alternators; insulation deterioration, polarisation index and dielectric absorption ratio; condition monitoring tools; vibration and motor current signature analysis; hot-line maintenance.

    Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)

    • Maintenance strategies
    • Preventive maintenance of transformers and motors
    • Insulation deterioration and polarisation index
    • Condition monitoring of electrical equipment
    • Vibration and motor current signature analysis
    • Hot-line maintenance
  4. Unit 4: Estimation and Costing

    8 hours

    Purpose and elements of estimating; tenders, quotations, price catalogues, labour rates and schedules of rates; cable sizing; estimates for residential and commercial wiring and underground LT service lines.

    Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)

    • Principles of estimating and costing
    • Tenders and quotations
    • Cable and conductor sizing
    • Estimating residential and commercial wiring
    • Estimating underground LT service lines
  5. Unit 5: Installation Testing and Electrical Safety

    8 hours

    CAT ratings and CAT-rated instruments; insulation resistance to earth and between conductors, the guard terminal; polarity and earth-continuity tests; portable appliance testers; two-pole, three-pole and clamp-on earth resistance tests.

    Marks: 14 in the end-semester exam · CCE: Seminar, open-book test or quiz (6 marks, Unit 5)

    • CAT ratings of test instruments
    • Insulation resistance testing
    • Polarity and earth continuity tests
    • Earth resistance testing methods