SPPU · Third Year Electrical Engineering · 2024 Pattern
Electrical Installation, Design & Condition Based Maintenance
PCC-303-ELE · Semester V · 3 credits · CCE 30 + end-semester 70
Unit 1: Economics of Distribution Systems
8 hoursDC two-wire and single- and three-phase AC supply systems compared on conductor volume, overhead versus underground; primary and secondary distribution; voltage drop in uniformly and non-uniformly loaded distributors; Kelvin's law; radial and ring feeders and feeder losses.
Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)
- Comparison of supply systems
- Primary and secondary distribution
- Voltage drop in AC distributors
- Kelvin's law
- Distribution feeders
Unit 2: Substations and Earthing
8 hoursClassification of substations and their equipment; single, sectionalised and main-and-transfer bus bars; equipment and neutral earthing; maintenance-free earthing; earth resistance testing, plate and pipe electrodes; step and touch voltages; substation earthing grid design to IEEE 80-2013.
Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)
- Substation classification and equipment
- Bus bar arrangements
- Equipment and neutral earthing
- Earth electrodes and earth resistance
- Step and touch voltages
- Substation earthing grid design
Unit 3: Maintenance and Condition Monitoring
8 hoursBreakdown, preventive and condition-based maintenance; maintaining transformers, induction motors and alternators; insulation deterioration, polarisation index and dielectric absorption ratio; condition monitoring tools; vibration and motor current signature analysis; hot-line maintenance.
Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)
- Maintenance strategies
- Preventive maintenance of transformers and motors
- Insulation deterioration and polarisation index
- Condition monitoring of electrical equipment
- Vibration and motor current signature analysis
- Hot-line maintenance
Unit 4: Estimation and Costing
8 hoursPurpose and elements of estimating; tenders, quotations, price catalogues, labour rates and schedules of rates; cable sizing; estimates for residential and commercial wiring and underground LT service lines.
Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)
- Principles of estimating and costing
- Tenders and quotations
- Cable and conductor sizing
- Estimating residential and commercial wiring
- Estimating underground LT service lines
Unit 5: Installation Testing and Electrical Safety
8 hoursCAT ratings and CAT-rated instruments; insulation resistance to earth and between conductors, the guard terminal; polarity and earth-continuity tests; portable appliance testers; two-pole, three-pole and clamp-on earth resistance tests.
Marks: 14 in the end-semester exam · CCE: Seminar, open-book test or quiz (6 marks, Unit 5)
- CAT ratings of test instruments
- Insulation resistance testing
- Polarity and earth continuity tests
- Earth resistance testing methods