RTMNU · Final Year B.Tech Mechanical Engineering · CBCS
Industrial Engineering
BEME801T · Semester VIII · 3 credits · College 30 + university 70
Unit 1: Productivity and Method Study
8 hoursConcept, types, factors, improvement tools and measurement of productivity; work study and method study — steps, process charts, string diagrams, motion and micro-motion study and SIMO charts.
Examined in the 70-mark end-semester paper
- Productivity and its measurement
- Productivity improvement techniques
- Method study and recording techniques
- Therbligs and SIMO charts
Unit 2: Work Measurement and Ergonomics
8 hoursStop-watch time study, work sampling, PMTS, MTM and the work-factor method; ergonomics, human factors, man–machine systems, display and control design, principles of motion economy and workplace design.
Examined in the 70-mark end-semester paper
- Time study and standard time
- Work sampling
- Predetermined motion time systems
- Ergonomics and human factors
- Motion study and principles of motion economy
Unit 3: Forecasting and Break-Even Analysis
7 hoursNeed for and classes of forecasting, judgmental methods, time series, least squares, moving averages and exponential smoothing; cost classification, production costs and break-even analysis.
Examined in the 70-mark end-semester paper
- Forecasting methods
- Forecast error and bias
- Types of cost
- Break-even analysis
Unit 4: Maintenance and Reliability
7 hoursObjectives and types of maintenance — preventive, predictive and breakdown; reliability and maintainability, failure data analysis, MTBF and MTTR, the bathtub curve, and series, parallel and standby systems.
Examined in the 70-mark end-semester paper
- Maintenance types: breakdown, preventive and predictive
- Failure rate and hazard rate
- MTTF and MTBF
- Bathtub curve and failure modes
- Series and parallel systems
- Maintainability and availability
Unit 5: Quality Control
8 hoursQuality definitions, quality of design and conformance, control charts and process capability; quality assurance and planning, quality audit, vendor quality rating, and acceptance sampling, sampling plans and the OC curve.
Examined in the 70-mark end-semester paper
- Dimensions and cost of quality
- Control charts for variables
- Control charts for attributes
- Process capability indices
- Vendor rating
- Acceptance sampling and OC curves
Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).