Engineering Economics and Product Design — formula sheet

Production & Industrial Engineering · GATE PI · SI units. Drafted with Aria, checked by the AiCanCode.org team.

Time value of money and interest formulas

  • F = P(1 + i)ⁿ — single-payment compound amount (F/P, i, n); P = present sum (₹), F = sum after n periods (₹), i = interest rate per period (decimal), n = number of periods.
  • P = F / (1 + i)ⁿ — single-payment present worth (P/F, i, n).
  • F = A[(1 + i)ⁿ − 1] / i — uniform-series compound amount (F/A, i, n); A = equal end-of-period amount (₹), first A at end of period 1.
  • A = F·i / [(1 + i)ⁿ − 1] — sinking fund (A/F, i, n).
  • P = A[(1 + i)ⁿ − 1] / [i(1 + i)ⁿ] — uniform-series present worth (P/A, i, n).
  • A = P·i(1 + i)ⁿ / [(1 + i)ⁿ − 1] — capital recovery (A/P, i, n); identity (A/P) = (A/F) + i.
  • P = G[(1 + i)ⁿ − 1 − n·i] / [i²(1 + i)ⁿ] — arithmetic-gradient present worth (P/G, i, n); G = yearly increase (₹), zero at end of period 1.
  • A = G[1/i − n / ((1 + i)ⁿ − 1)] — gradient to uniform series (A/G, i, n).
  • iₑ = (1 + r/m)ᵐ − 1 — effective annual rate; r = nominal annual rate (decimal), m = compounding periods per year.
  • iₑ = eʳ − 1 — effective rate under continuous compounding.
  • P = A / i — present worth of a perpetuity.

Present worth, annual worth and rate of return

  • PW = Σ Fₜ / (1 + i)ᵗ — present worth of net cash flows Fₜ (₹) at end of year t, discounted at the MARR i; accept if PW ≥ 0.
  • AW = PW × (A/P, i, n) — annual worth; compares unequal-life alternatives directly.
  • CR = (P − S)(A/P, i, n) + S·i — capital recovery cost; P = first cost (₹), S = salvage value (₹).
  • Σ Fₜ / (1 + i*)ᵗ = 0 — internal rate of return i*; accept a single project if i* ≥ MARR; use incremental IRR for mutually exclusive alternatives.
  • i* ≈ i₁ + (i₂ − i₁)·PW₁ / (PW₁ − PW₂) — linear interpolation between trial rates with PW₁ > 0 > PW₂.
  • CC = P + A / i — capitalised cost of a perpetual asset with annual cost A.
  • n_p = first cost / annual net inflow — simple payback period (uniform inflows; ignores interest).

Depreciation methods

  • Dₜ = (C − S) / n — straight-line depreciation; C = first cost (₹), S = salvage (₹), n = life (years).
  • Dₜ = R·Bₜ₋₁, Bₜ = C(1 − R)ᵗ — declining balance at rate R on opening book value; book value not taken below S.
  • R = 2 / n — double-declining-balance rate.
  • R = 1 − (S / C)^(1/n) — fixed-percentage (Matheson) rate that reaches S at year n.
  • Dₜ = (n − t + 1)(C − S) / [n(n + 1)/2] — sum-of-years'-digits depreciation in year t.
  • A = (C − S)·i / [(1 + i)ⁿ − 1], Dₜ = A(1 + i)^(t−1), Bₜ = C − A(F/A, i, t) — sinking-fund method; i = fund interest rate.

Elements of cost and overheads

  • Prime cost = DM + DL + DE — direct material + direct labour + direct expenses (₹).
  • Factory cost = prime cost + factory overheads — also called works cost.
  • Production cost = factory cost + administrative overheads.
  • Total cost = production cost + selling and distribution overheads; Selling price = total cost + profit.
  • SP = TC / (1 − p) — selling price for profit p (decimal) on selling price; SP = TC(1 + q) for profit q on cost.
  • r_MH = (depreciation + power + maintenance + shop overhead share) / machine hours — machine hour rate (₹/h).

Cost estimation of castings, forgings and machined parts

  • m = ρ·V — mass from density and volume (watch mm³ → cm³ ÷ 1,000).
  • m_poured = m_casting / η_y — metal poured from casting yield η_y.
  • m_stock = m_net + scale + flash + tonghold + sprue + shear losses — forging stock mass; L = m_stock / (ρ·A) stock length.
  • N = 1000·V / (π·D) — spindle speed (rev/min); V = cutting speed (m/min), D = diameter (mm).
  • t = (L + approach + overrun) / (f·N) — turning time per pass (min); f = feed (mm/rev), L in mm.
  • passes = (D₀ − D₁) / (2·d) — number of turning passes for depth of cut d (round up).

Break-even analysis

  • Q* = F / (s − v) — break-even quantity; F = fixed cost per period (₹), s = selling price (₹/unit), v = variable cost (₹/unit).
  • PV = (s − v) / s, R* = F / PV — P/V ratio and break-even sales (₹).
  • Profit = (s − v)·Q − F; Q = (F + target profit) / (s − v).
  • MoS = actual sales − break-even sales — margin of safety; profit = MoS × PV.
  • Q_e = (F₂ − F₁) / (v₁ − v₂) — cost-indifference volume of two processes.

Make-or-buy decisions

  • TC_make = F_m + c_make·Q — F_m = avoidable fixed cost of making (₹); c_make = variable cost + opportunity cost per unit (₹/unit).
  • TC_buy = (p + freight + inspection)·Q — p = purchase price (₹/unit).
  • Q_e = F_m / (p − c_make) — make above this quantity, buy below it (valid when p > c_make).
  • c_opp = contribution per scarce hour × hours per part — opportunity cost when capacity is fully used.

Product life cycle and product development process

  • CCF(t) = −C_dev + Σ contributionₖ — cumulative cash flow of a product programme.
  • t_b = t₁ + |CCF(t₁)| / contribution in year (t₁ + 1) — break-even time by interpolation.
  • NPV = −C_dev + Σ CFₖ / (1 + i)ᵏ — net present value of the programme.

Concept generation and selection

  • N = n₁ × n₂ × … × n_k — combinations in a morphological chart.
  • Net = (number of +) − (number of −) — Pugh screening score.
  • S_j = Σ wᵢ·rᵢⱼ, Σ wᵢ = 1 — weighted score of concept j; wᵢ = weight, rᵢⱼ = rating.

Design for manufacture and assembly

  • E = 3·N_min / t_ma — DFA design efficiency (Boothroyd–Dewhurst); N_min = theoretical minimum part count, t_ma = total manual assembly time (s), 3 s = ideal time per part.
  • C_a = t_ma × labour rate — assembly cost per unit.
  • Q_b = extra tooling cost / saving per unit — volume needed to pay back a part-consolidation redesign.

Value engineering and value analysis

  • V = F / C — value; F = function or performance measure, C = cost (₹).
  • VI = W / C_f — value index of a function; W = worth (lowest cost to perform it reliably), C_f = present cost of the function.
  • V₂ / V₁ = (F₂ / C₂) / (F₁ / C₁) — value improvement ratio.

Quality function deployment

  • IR = target rating / current rating — improvement ratio.
  • RW = importance × IR × sales point, NW = RW / Σ RW × 100% — raw and normalised weight of a customer requirement.
  • TI_j = Σ wᵢ × rᵢⱼ — technical importance of characteristic j; rᵢⱼ = 9 (strong), 3 (medium), 1 (weak), 0.
  • RTI_j = TI_j / Σ TI × 100% — relative technical importance.

Reverse engineering and rapid prototyping

  • N_L = H / t — number of layers; H = build height (mm), t = layer thickness (mm).
  • T = N_L × (A / h_s / v_s + t_r) — laser AM build time; A = scanned area per layer (mm²), h_s = hatch spacing (mm), v_s = scan speed (mm/s), t_r = recoat time per layer (s).
  • Q = w × t × v, T = V / Q + N_L × t_c — extrusion (FDM) deposition rate and build time; w = road width (mm), v = nozzle speed (mm/s), V = part volume (mm³), t_c = layer-change time (s).

Intellectual property: patents and design registration

  • Patent term = 20 years from the filing date — in India, subject to annual renewal fees.
  • Design term = 10 years + one 5-year extension — maximum 15 years under the Designs Act, 2000.
  • PW = r·S·(P/A, i, n) — present worth of a royalty stream; r = royalty rate, S = annual sales (₹), n = remaining years.