Engineering Economics and Product Design — formula sheet
Production & Industrial Engineering · GATE PI · SI units. Drafted with Aria, checked by the AiCanCode.org team.
Time value of money and interest formulas
F = P(1 + i)ⁿ— single-payment compound amount (F/P, i, n); P = present sum (₹), F = sum after n periods (₹), i = interest rate per period (decimal), n = number of periods.P = F / (1 + i)ⁿ— single-payment present worth (P/F, i, n).F = A[(1 + i)ⁿ − 1] / i— uniform-series compound amount (F/A, i, n); A = equal end-of-period amount (₹), first A at end of period 1.A = F·i / [(1 + i)ⁿ − 1]— sinking fund (A/F, i, n).P = A[(1 + i)ⁿ − 1] / [i(1 + i)ⁿ]— uniform-series present worth (P/A, i, n).A = P·i(1 + i)ⁿ / [(1 + i)ⁿ − 1]— capital recovery (A/P, i, n); identity(A/P) = (A/F) + i.P = G[(1 + i)ⁿ − 1 − n·i] / [i²(1 + i)ⁿ]— arithmetic-gradient present worth (P/G, i, n); G = yearly increase (₹), zero at end of period 1.A = G[1/i − n / ((1 + i)ⁿ − 1)]— gradient to uniform series (A/G, i, n).iₑ = (1 + r/m)ᵐ − 1— effective annual rate; r = nominal annual rate (decimal), m = compounding periods per year.iₑ = eʳ − 1— effective rate under continuous compounding.P = A / i— present worth of a perpetuity.
Present worth, annual worth and rate of return
PW = Σ Fₜ / (1 + i)ᵗ— present worth of net cash flows Fₜ (₹) at end of year t, discounted at the MARR i; accept if PW ≥ 0.AW = PW × (A/P, i, n)— annual worth; compares unequal-life alternatives directly.CR = (P − S)(A/P, i, n) + S·i— capital recovery cost; P = first cost (₹), S = salvage value (₹).Σ Fₜ / (1 + i*)ᵗ = 0— internal rate of return i*; accept a single project if i* ≥ MARR; use incremental IRR for mutually exclusive alternatives.i* ≈ i₁ + (i₂ − i₁)·PW₁ / (PW₁ − PW₂)— linear interpolation between trial rates with PW₁ > 0 > PW₂.CC = P + A / i— capitalised cost of a perpetual asset with annual cost A.n_p = first cost / annual net inflow— simple payback period (uniform inflows; ignores interest).
Depreciation methods
Dₜ = (C − S) / n— straight-line depreciation; C = first cost (₹), S = salvage (₹), n = life (years).Dₜ = R·Bₜ₋₁,Bₜ = C(1 − R)ᵗ— declining balance at rate R on opening book value; book value not taken below S.R = 2 / n— double-declining-balance rate.R = 1 − (S / C)^(1/n)— fixed-percentage (Matheson) rate that reaches S at year n.Dₜ = (n − t + 1)(C − S) / [n(n + 1)/2]— sum-of-years'-digits depreciation in year t.A = (C − S)·i / [(1 + i)ⁿ − 1],Dₜ = A(1 + i)^(t−1),Bₜ = C − A(F/A, i, t)— sinking-fund method; i = fund interest rate.
Elements of cost and overheads
Prime cost = DM + DL + DE— direct material + direct labour + direct expenses (₹).Factory cost = prime cost + factory overheads— also called works cost.Production cost = factory cost + administrative overheads.Total cost = production cost + selling and distribution overheads;Selling price = total cost + profit.SP = TC / (1 − p)— selling price for profit p (decimal) on selling price;SP = TC(1 + q)for profit q on cost.r_MH = (depreciation + power + maintenance + shop overhead share) / machine hours— machine hour rate (₹/h).
Cost estimation of castings, forgings and machined parts
m = ρ·V— mass from density and volume (watch mm³ → cm³ ÷ 1,000).m_poured = m_casting / η_y— metal poured from casting yield η_y.m_stock = m_net + scale + flash + tonghold + sprue + shear losses— forging stock mass;L = m_stock / (ρ·A)stock length.N = 1000·V / (π·D)— spindle speed (rev/min); V = cutting speed (m/min), D = diameter (mm).t = (L + approach + overrun) / (f·N)— turning time per pass (min); f = feed (mm/rev), L in mm.passes = (D₀ − D₁) / (2·d)— number of turning passes for depth of cut d (round up).
Break-even analysis
Q* = F / (s − v)— break-even quantity; F = fixed cost per period (₹), s = selling price (₹/unit), v = variable cost (₹/unit).PV = (s − v) / s,R* = F / PV— P/V ratio and break-even sales (₹).Profit = (s − v)·Q − F;Q = (F + target profit) / (s − v).MoS = actual sales − break-even sales— margin of safety;profit = MoS × PV.Q_e = (F₂ − F₁) / (v₁ − v₂)— cost-indifference volume of two processes.
Make-or-buy decisions
TC_make = F_m + c_make·Q— F_m = avoidable fixed cost of making (₹); c_make = variable cost + opportunity cost per unit (₹/unit).TC_buy = (p + freight + inspection)·Q— p = purchase price (₹/unit).Q_e = F_m / (p − c_make)— make above this quantity, buy below it (valid when p > c_make).c_opp = contribution per scarce hour × hours per part— opportunity cost when capacity is fully used.
Product life cycle and product development process
CCF(t) = −C_dev + Σ contributionₖ— cumulative cash flow of a product programme.t_b = t₁ + |CCF(t₁)| / contribution in year (t₁ + 1)— break-even time by interpolation.NPV = −C_dev + Σ CFₖ / (1 + i)ᵏ— net present value of the programme.
Concept generation and selection
N = n₁ × n₂ × … × n_k— combinations in a morphological chart.Net = (number of +) − (number of −)— Pugh screening score.S_j = Σ wᵢ·rᵢⱼ,Σ wᵢ = 1— weighted score of concept j; wᵢ = weight, rᵢⱼ = rating.
Design for manufacture and assembly
E = 3·N_min / t_ma— DFA design efficiency (Boothroyd–Dewhurst); N_min = theoretical minimum part count, t_ma = total manual assembly time (s), 3 s = ideal time per part.C_a = t_ma × labour rate— assembly cost per unit.Q_b = extra tooling cost / saving per unit— volume needed to pay back a part-consolidation redesign.
Value engineering and value analysis
V = F / C— value; F = function or performance measure, C = cost (₹).VI = W / C_f— value index of a function; W = worth (lowest cost to perform it reliably), C_f = present cost of the function.V₂ / V₁ = (F₂ / C₂) / (F₁ / C₁)— value improvement ratio.
Quality function deployment
IR = target rating / current rating— improvement ratio.RW = importance × IR × sales point,NW = RW / Σ RW × 100%— raw and normalised weight of a customer requirement.TI_j = Σ wᵢ × rᵢⱼ— technical importance of characteristic j; rᵢⱼ = 9 (strong), 3 (medium), 1 (weak), 0.RTI_j = TI_j / Σ TI × 100%— relative technical importance.
Reverse engineering and rapid prototyping
N_L = H / t— number of layers; H = build height (mm), t = layer thickness (mm).T = N_L × (A / h_s / v_s + t_r)— laser AM build time; A = scanned area per layer (mm²), h_s = hatch spacing (mm), v_s = scan speed (mm/s), t_r = recoat time per layer (s).Q = w × t × v,T = V / Q + N_L × t_c— extrusion (FDM) deposition rate and build time; w = road width (mm), v = nozzle speed (mm/s), V = part volume (mm³), t_c = layer-change time (s).
Intellectual property: patents and design registration
Patent term = 20 years from the filing date— in India, subject to annual renewal fees.Design term = 10 years + one 5-year extension— maximum 15 years under the Designs Act, 2000.PW = r·S·(P/A, i, n)— present worth of a royalty stream; r = royalty rate, S = annual sales (₹), n = remaining years.