Production & Industrial Engineering
Engineering Economics and Product Design
Time value of money, depreciation, costing, break-even, value engineering.
Your progress in this subject0 of 14 · 0%
- 1Time value of money and interest formulasTime value of money, cash-flow diagrams, simple vs compound interest, the six discrete compound-interest factors, gradients, and nominal, effective and continuous rates.
- 2Present worth, annual worth and rate of returnComparing projects by present worth, annual worth (EUAC) and internal rate of return against the MARR, including unequal lives, incremental analysis and payback.
- 3Depreciation methodsStraight-line, declining-balance, double-declining, sum-of-years'-digits, sinking-fund and units-of-production depreciation, with book values and the salvage floor.
- 4Elements of cost and overheadsDirect material, labour and expenses, the classes of overhead, the cost ladder from prime cost to selling price, and overhead absorption by labour-hour, machine-hour and ABC.
- 5Cost estimation of castings, forgings and machined partsEstimating material, labour and overhead cost of castings (allowances, yield), forgings (scale, flash and tonghold losses, stock length) and machined parts (passes, machining time, rates).
- 6Break-even analysisBreak-even volume and sales, contribution and P/V ratio, margin of safety, target-profit volume and the cost-indifference point for choosing between processes.
- 7Make-or-buy decisionsMake-or-buy decisions using relevant (avoidable) costs, opportunity cost under full capacity, the make-buy indifference quantity, and the qualitative factors.
- 8Product life cycle and product development processStages of the product life cycle and their strategies, the six-phase product development process with stage-gates and concurrent engineering, cost commitment, and break-even time of a development programme.
- 9Concept generation and selectionGenerating concepts by functional decomposition, external and internal search, morphological charts and TRIZ, and selecting them with Pugh screening and weighted scoring matrices.
- 10Design for manufacture and assemblyDFM rules by process, DFA guidelines, Boothroyd–Dewhurst minimum part count and design efficiency, and tooling payback for part-consolidation redesigns.
- 11Value engineering and value analysisValue as function over cost, types of value, basic and secondary functions, worth and value index, FAST diagrams and the value engineering job plan, with savings and payback.
- 12Quality function deploymentThe House of Quality room by room, planning-matrix weights and improvement ratios, technical importance with 9-3-1 relationships, and the four phases of QFD.
- 13Reverse engineering and rapid prototypingReverse engineering workflow from scanning to CAD and its legal limits, additive manufacturing process families and materials, prototype types, and build-time estimation.
- 14Intellectual property: patents and design registrationForms of IP for engineers, Indian patent criteria, exclusions, procedure and 20-year term, registrable designs and the 10 + 5 year term, and the economics of licensing.