Core engineering

Mining Engineering

From mine surveying and rock mechanics to ventilation and mine planning — and the careers that follow.

Core subjects with Aria

Read the notes, or pick a subject and Aria teaches it from the basics, with the formula first, units checked, and numericals worked step by step.

Mining Geology

Minerals, rocks, structures, ore deposits, coal geology, exploration

Engineering Mechanics

Force systems, equilibrium, trusses, friction, kinematics, momentum

Mine Surveying

Levelling, theodolite, traversing, correlation, total station, GPS

Mine Development, Drilling and Blasting

Access to deposits, shaft sinking, drivages, drilling, explosives, blasting

Geomechanics and Ground Control

Rock properties, rock mass classification, failure theories, supports, subsidence, slopes

Surface Mining

Opencast layout, benches, loading, transport, stripping ratio, continuous systems

Underground Coal Mining

Bord and pillar, depillaring, longwall, thick seam methods, mechanisation

Underground Metal Mining

Open, supported and caved stoping, stope mechanisation, ore handling, filling

Mine Machinery

Power transmission, compressors, haulage, conveyors, hoisting, pumps, crushers

Mine Ventilation

Mine air, gases, heat, airflow, fans, ventilation networks, planning

Mine Hazards, Environment and Legislation

Fires, explosions, inundation, rescue, pollution control, mining laws

Mine Planning, Economics and Systems Engineering

Reserve estimation, valuation, investment, production planning, operations research, reliability

GATE MN preparation

The GATE MN paper covers engineering mathematics, general aptitude and the subjects above. Take timed mocks marked the way GATE marks, or practise any subject with Aria.

GATE MN mock testsFull 65-question papers and subject tests, with worked solutions.Take a test
General aptitude practice

PSUs, government jobs and core placements

Many PSUs shortlist engineers through GATE scores; others run their own exams. Recruiting PSUs, cut-offs and eligibility change every year — always check the official notification.

PSUs that have recruited through GATE

Coal India Limited (CIL) · NLC India Limited · NMDC Limited · The Singareni Collieries Company Limited (SCCL) · Hindustan Copper Limited · MOIL Limited · Steel Authority of India Limited (SAIL) · NTPC Limited (coal mining) · Uranium Corporation of India Limited (UCIL)

Other exams

  • DGMS First Class Mine Manager's Certificate of Competency
  • DGMS Second Class Mine Manager's Certificate of Competency
  • UPSC recruitment for Indian Bureau of Mines (Assistant Controller of Mines)

Core companies

Hindustan Zinc · Vedanta · Tata Steel · JSW Steel · Adani Enterprises · Essel Mining & Industries · UltraTech Cement · Epiroc India · Sandvik · Caterpillar India

Timed mock interview (scored)Aptitude for placement testsResume check

Switch to IT

Plenty of Mining graduates get software jobs — service companies hire from every branch. This is the order that works when you haven't coded much.

  1. 1Aptitude first Every service company tests it before anything else.
  2. 2One language, properly Java from the basics, with Aria when you are stuck.
  3. 3DSA, pattern by pattern The problems that actually get asked, in order.
  4. 4SQL 240 problems on real schemas — a common test round.
  5. 5Your resume Import it, get an ATS check, fix weak bullets.
  6. 6Mock interviews Practise the interview before the interview.
Build my IT plan with Aria