Process Control and Automation — formula sheet
Instrumentation Engineering · GATE IN · SI units. Drafted with Aria, checked by the AiCanCode.org team.
Process Variables and Process Dynamics
G(s) = K·e^(−θs) / (τs + 1)— First-order-plus-dead-time (FOPDT) model; K steady-state gain (output unit/input unit), τ time constant (s), θ dead time (s); self-regulating processes.y(t) = y₀ + K·Δu·[1 − e^(−(t − θ)/τ)]for t ≥ θ — Step response of the FOPDT model; Δu input step; reaches 63.2 % of its change at t = θ + τ, 86.5 % at θ + 2τ, 95.0 % at θ + 3τ, 98.2 % at θ + 4τ.K = Δy_ss / Δu— Steady-state process gain from a step test.τ = A·R— Time constant of a free-draining tank; A cross-section (m²), R linearised outlet resistance dh/dq (s/m²); steady gain to inflow is R.θ = L / v— Transport (dead) time; L distance (m), v velocity (m/s).τ = 1.5·(t₆₃ − t₂₈), θ = t₆₃ − τ— Two-point (Smith) FOPDT fit; t₂₈, t₆₃ times to 28.3 % and 63.2 % of the change, measured from the step.
Self-Regulating and Non-Self-Regulating Processes
H(s)/Q_i(s) = R / (A·R·s + 1)— Free-draining tank (self-regulating); h level (m), q_i inflow (m³/s).H(s)/Q_i(s) = 1 / (A·s)— Tank with pump-fixed outflow (integrating); level ramps at dh/dt = (q_i − q_o)/A (m/s).G(s) = K / (τs − 1)— Runaway (open-loop unstable) process, e.g. exothermic reactor.offset = Δd / K_c— Level offset with P-only control of an integrating tank after a sustained flow disturbance Δd (m³/s); K_c in (m³/s) per m.
Controller Modes and PID Tuning Methods
u(t) = u_b + K_c·[e + (1/T_i)·∫e dt + T_d·de/dt]— Ideal (ISA) PID; e = SP − PV, K_c gain (%/%), T_i integral time (s), T_d derivative time (s), u_b bias.K_p = K_c, K_i = K_c/T_i, K_d = K_c·T_d— Conversion to parallel form K_p + K_i/s + K_d·s.PB = 100 / K_c— Proportional band (%), K_c dimensionless.e_ss = Δr / (1 + K_c·K)— Offset of P-only control of a self-regulating process (gain K) after a set-point step Δr.Z–N ultimate cycle: P K_c = 0.5K_u; PI K_c = 0.45K_u, T_i = T_u/1.2; PID K_c = 0.6K_u, T_i = T_u/2, T_d = T_u/8— K_u ultimate gain, T_u ultimate period (s).Z–N reaction curve: P K_c = τ/(Kθ); PI K_c = 0.9τ/(Kθ), T_i = 3.33θ; PID K_c = 1.2τ/(Kθ), T_i = 2θ, T_d = 0.5θ— From an FOPDT fit.IMC PI: K_c = τ / [K(λ + θ)], T_i = τ— λ desired closed-loop time constant (s).
Cascade, Ratio, Feedforward and Split-Range Control
F_B,sp = R·F_A— Ratio control set point; F_A wild flow, R desired ratio.ΔP_B / ΔP_A = R²— Ratio of orifice DP signals for flow ratio R (no square-root extraction).G_ff(s) = −G_d(s) / G_p(s)— Ideal feedforward compensator; static version K_ff = −K_d/K_p; realisable only if the dead time of G_d ≥ that of G_p.K_cl = K_c2·K₂/(1 + K_c2·K₂), τ_cl = τ₂/(1 + K_c2·K₂)— Closed inner loop of a cascade with P-only secondary controller on a first-order process (K₂, τ₂).opening (%) = (u − u_start)/(u_end − u_start) × 100— Split-range valve position for controller output u over its assigned signal range.
Control Valves: Types, Characteristics and Sizing
Q = K_v·√(ΔP / SG)— Liquid sizing (non-choked); Q (m³/h), ΔP (bar), SG relative to water, K_v (m³/h per √bar).Q = C_v·√(ΔP / SG)— Same in US units: Q (US gpm), ΔP (psi);C_v = 1.156·K_v.f = x(linear),f = R^(x − 1)(equal percentage) — Inherent characteristic; f = Q/Q_max at constant ΔP, x fractional travel, R rangeability.Q₂/Q₁ = R^(x₂ − x₁)— Equal-percentage flow ratio for a travel change.q = f / √(a + (1 − a)·f²)— Installed flow fraction; a valve authority = ΔP_valve,full open / ΔP_total.
Actuators, Positioners and I/P Converters
P_out = P_min + (P_max − P_min)·(I − 4)/16— I/P converter output pressure (kPa, e.g. 20–100 kPa) for input current I (mA, 4–20).F = P·A— Diaphragm force (N); P gauge pressure (Pa), A effective area (m²).x = stroke·(P − P_start)/(P_end − P_start)— Spring-diaphragm travel over the spring range (friction neglected).k = (P_end − P_start)·A / stroke— Actuator spring rate (N/m).
P&ID Drawing and ISA Instrumentation Symbols
I = 4 + 16·(x − x_min)/(x_max − x_min)— Transmitter current for a measured value x over its calibrated range.Q = Q_max·√((I − 4)/16)— Flow from a DP transmitter whose output is linear in ΔP (no square-root extraction).
PLC Architecture and I/O Modules
resolution = (x_max − x_min) / 2ⁿ— ADC/DAC step for n bits (some vendors use 2ⁿ − 1).x = x_min + (C − C_min)·(x_max − x_min)/(C_max − C_min)— Scaling a raw count C to engineering units.t_response,max ≈ t_filter + 2·t_scan + t_output— Worst-case PLC response time (s).t_pulse > t_scan + t_filter— Shortest input pulse guaranteed to be detected.
Ladder Logic Programming
series = AND, parallel = OR, NC contact = NOT— Boolean equivalence of ladder contacts.M = (Start + M)·Stop·OL— Start–stop seal-in; Stop and OL bits are 1 when healthy (NC-wired field contacts).preset count = T_delay / time base— Timer preset for a given time base (s).
Distributed Control Systems
A = MTBF / (MTBF + MTTR)— Availability; MTBF, MTTR in hours.A_parallel = 1 − (1 − A₁)·(1 − A₂)— Redundant pair, independent failures, perfect switchover.CPU load = (Σ block execution times + overhead) / cycle time— Controller loading.modules = ⌈N·(1 + s)/c⌉— I/O modules for N points, spare fraction s, c channels per module.
SCADA Systems
t_tx = N_bits / R— Transmission time (s); N_bits including start/parity/stop bits, R bit rate (bit/s).T_cycle = Σ (t_request + t_response + t_turnaround)— Polling cycle time over all RTUs.
Field Communication: 4-20 mA, HART, Modbus, Profibus and Fieldbus
I = 4 + 16·(PV − LRV)/(URV − LRV)— 4–20 mA signal (mA); LRV, URV lower and upper range values.V_R = I·R— Receiver voltage; 250 Ω gives 1–5 V for 4–20 mA.R_loop,max = (V_supply − V_tx,min) / I_max— Maximum external loop resistance (Ω); I_max 20 mA (or about 22 mA for fault signalling).HART: 1200 Hz = 1, 2200 Hz = 0, 1200 bit/s, ≈ ±0.5 mA— Bell 202 FSK superimposed on the loop; needs ≥ about 230 Ω loop resistance.FOUNDATION Fieldbus H1 / PROFIBUS PA: 31.25 kbit/s— Bus-powered IEC 61158-2 physical layer; H1 segment up to 1900 m.
Safety Instrumented Systems and SIL
RRF = 1 / PFDavg— Risk reduction factor.SIL 1: 10⁻² ≤ PFDavg < 10⁻¹; SIL 2: 10⁻³–10⁻²; SIL 3: 10⁻⁴–10⁻³; SIL 4: 10⁻⁵–10⁻⁴— Low-demand mode SIL bands.PFD_required = f_tolerable / (f_initiating × Π PFD_IPL)— LOPA SIL target; frequencies per year.PFDavg(1oo1) ≈ λ_DU·T_I/2; PFDavg(1oo2) ≈ (λ_DU·T_I)²/3 + β·λ_DU·T_I/2; PFDavg(2oo3) ≈ (λ_DU·T_I)² + β·λ_DU·T_I/2— λ_DU dangerous undetected failure rate (1/h), T_I proof-test interval (h), β common-cause fraction; valid for λ_DU·T_I ≪ 1.
Control of Boilers, Distillation Columns and Heat Exchangers
F_fw,sp = F_steam + Δ_LC— Three-element drum level: feedwater flow set point = steam flow + level-controller trim (kg/s).Q = ṁ_p·c_p·(T_out − T_in) = ṁ_s·h_fg— Steam-heater energy balance; Q (kW), ṁ (kg/s), c_p (kJ/kg·K), h_fg latent heat from steam tables (kJ/kg).D/F = (z_F − x_B)/(x_D − x_B)— Column material balance; F, D, B flows (kmol/h), light-key mole fractions z_F, x_D, x_B.R = L/D, V = L + D— Reflux ratio and overhead vapour (total condenser).EA ≈ O₂/(21 − O₂) × 100 %— Approximate excess air from dry flue-gas O₂ (vol %).