Why it matters
Designing an embedded system is the engineering process that turns a requirement into a working product. Engineers use the design process to organise work, make trade-offs (for example between hardware and software), and to plan verification, validation and testing so the final system meets functional and non-functional requirements such as real-time deadlines, power and cost.
Key ideas
- Specification: a precise, measurable document that turns requirements into engineering targets (e.g., “response time ≤ 5 ms for event X”, or “battery life ≥ 48 h under normal use”). A good specification is complete, consistent, verifiable and traceable.
- Architecture: high-level structure of the system showing major components and interfaces. Typical embedded architecture blocks: sensors, actuators, processing unit (microcontroller/CPU), memory, communication buses, power supply. When asked for a diagram, draw boxes for each block and arrows for signals (label CPU↔Sensor: signal type and data rate; CPU↔Actuator: control signal power characteristics; bus: name and bandwidth).
- Hardware–software partitioning: dividing system functions between hardware (HW) and software (SW) to meet constraints. Use performance, cost, power and development time as criteria. Define hardware acceleration: moving a computation from software to dedicated hardware to improve speed or reduce energy per operation.
- Amdahl’s law (definition): gives the theoretical speedup when part of a system is improved. Assumptions: a fixed workload, only a fraction f is accelerated by factor S, rest remains unchanged.
- Scheduling: assigning CPU time to tasks so deadlines are met. Important models: periodic tasks, sporadic tasks, deadlines equal to periods. Define preemptive scheduling (tasks can be interrupted) and non-preemptive scheduling (cannot be interrupted). Also know EDF (Earliest Deadline First): a dynamic-priority uniprocessor scheduler that, with D_i = T_i and no self-suspension/overheads, is schedulable iff U ≤ 1. For RM, an exact fixed-priority test is response-time analysis: R_i = C_i + Σ_{j∈hp(i)} ceil(R_i/T_j) · C_j, and task i is schedulable if R_i ≤ D_i.
- Rate Monotonic (RM) scheduling theorem (statement): For a set of independent, periodic, preemptable tasks with static priorities and deadlines equal to periods, the processor utilisation U = Σ(Ci/Ti) is schedulable if U ≤ n(2^{1/n} − 1) where n is number of tasks. Assumptions: tasks are independent, deadlines = periods, context-switch overhead ignored, worst-case execution times known.
- Derivation sketch commonly required in exams: use the critical-instant theorem (worst case when all tasks release synchronously) and the Liu & Layland inequality ∏(U_i + 1) ≤ 2; by symmetry the least upper bound occurs when all U_i are equal, yielding U_bound = n(2^{1/n} − 1). The limit as n→∞ is ln 2. For finite n you state this as a sufficient bound; if U exceeds that bound the test is inconclusive (the task set may still be schedulable). Universities commonly ask to show the bound formula and compute for small n.
- Verification vs Validation: Verification = “Are we building the product right?” (check design/specs, run unit tests, formal proof, code reviews). Validation = “Are we building the right product?” (system meets user needs in target environment, user acceptance tests).
- Integration and testing: integrate HW and SW incrementally; use test plans derived from specifications. Define system-level test (tests full product), acceptance test (customer environment), and regression test (repeat after changes).
- Risk analysis and mitigation: identify high-risk items (timing, safety, supply), reduce risk by prototypes, redundant design, deadline slack, simulation.
Diagrams to draw when asked (describe exactly):
- V-model: Draw a large V shape. Left descending side: Requirements → System specification → Architecture → Module design. Right ascending side: Module test → Integration test → System test → Acceptance test. Connect corresponding levels across the V to show verification activities.
- Block-level architecture: Draw CPU box in center, labelled with microcontroller model and clock frequency; draw Memory (RAM, Flash) boxes connected with a bus labelled with bus name and bandwidth; draw Sensor boxes with signal types (analog/digital) and sample rates; draw Actuator boxes with required power and control signals.
Formulas
A = 1 / ((1 - f) + f / S) — Amdahl’s overall speedup. Where A = overall speedup (dimensionless), f = fraction of execution time accelerated (dimensionless, 0–1), S = speedup of accelerated part (dimensionless). Applies when total work is fixed and only fraction f is accelerated.
U = Σ (Ci / Ti) — Processor utilisation for periodic tasks. Ci = worst-case execution time of task i (seconds), Ti = period of task i (seconds). Dimensionless. Applies for periodic task systems.
U_bound(n) = n (2^{1/n} - 1) — Liu & Layland utilization bound for Rate Monotonic scheduling. n = number of tasks (integer). Dimensionless. Assumptions listed in Key ideas.
P = V · I — Electrical power. For DC or instantaneous values: p(t) = v(t) · i(t). For sinusoidal AC using RMS values, average real power is P = V_rms · I_rms · cosφ (power factor cosφ = 1 for purely resistive loads). Units: P in watts (W), V in volts (V), I in amperes (A).
E = P · t — Energy consumed. E = energy (joules, J), P = power (watts), t = time (seconds). Applies when power P is approximately constant over interval t.
R_system = Π Ri — Reliability of series system. Ri = reliability (probability of success) of component i over mission time. Dimensionless probability. Applies when components are in series (system fails if any component fails) and failures independent.
Worked examples
- HW–SW partitioning with Amdahl’s law (numerical)
- Problem: A computation takes 100 s on software-only. You can implement 40% of execution time in hardware that will be 5× faster. What is overall execution time and speedup?
- Formula:
A = 1 / ((1 - f) + f / S) - Values: f = 0.40, S = 5
- Compute: (1 - f) = 0.60; f/S = 0.40 / 5 = 0.08; denominator = 0.60 + 0.08 = 0.68
- Overall speedup A = 1 / 0.68 = 1.470588 ≈ 1.4706 (dimensionless)
- Original time = 100 s, new time = 100 s / 1.470588 = 68.0 s
- Final answer: overall execution time = 68.0 s, overall speedup ≈ 1.47×.
- Rate Monotonic schedulability (numerical)
- Problem: Three periodic tasks with (Ci in ms, Ti in ms): Task1 (C1=1, T1=4), Task2 (C2=1, T2=5), Task3 (C3=2, T3=10). Are they schedulable under RM?
- Step 1: Compute utilisation U = Σ(Ci/Ti) = 1/4 + 1/5 + 2/10 = 0.25 + 0.20 + 0.20 = 0.65
- Step 2: Compute bound for n=3:
U_bound = 3 (2^{1/3} - 1). 2^{1/3} ≈ 1.2599, so (2^{1/3} - 1) ≈ 0.2599. Multiply by 3 gives U_bound ≈ 0.7797. - Step 3: Compare: U = 0.65 ≤ U_bound ≈ 0.7797. Under RM assumptions (periodic, independent, deadlines = periods, preemptive, no overhead) the task set is schedulable.
- Final answer: Schedulable under RM (U = 0.65 ≤ 0.7797).
- Quick reliability example (short)
- Problem: Two series components with reliabilities R1 = 0.99 and R2 = 0.98 over mission time. System reliability R_sys = R1·R2 = 0.99 × 0.98 = 0.9702. Final: 0.9702.
Common mistakes
- Forgetting to include interrupt, context-switch and I/O overhead in execution times Ci.
- Applying Amdahl’s law without fixing total workload assumption (for scalable workloads, Gustafson’s law may apply instead).
- Not documenting non-functional requirements (timing, power, thermal) precisely; this makes testing and verification impossible.
- Designing integration tests only at the end; integration should be incremental.
For your exam
Question types you will see: definitions (short), describe a process (V-model, waterfall vs iterative), derive the RM bound or state and apply it, numerical problems using Amdahl and scheduling utilisation, draw architecture diagrams and label important signals, write a test plan outline, explain verification vs validation. What full-marks answers include:
- For definitions: a clear term definition and one short example.
- For derivations: state assumptions explicitly, show steps, conclude with final formula and comment on applicability.
- For numericals: list given data with units, write the formula, substitute values step-by-step, carry units, give final answer with units and a short interpretation.
- For diagrams: draw labelled blocks and arrows; annotate constraints (e.g., bandwidth, sample rates, voltages) and mention assumptions.
Quick check
- What is the difference between verification and validation?
- State Amdahl’s law and name one assumption behind it.
- For two tasks with (C1=2 ms, T1=5 ms) and (C2=1 ms, T2=10 ms), compute utilisation and say if U ≤ U_bound for n=2.
Answers: Verification checks ‘‘are we building it right’’; Validation checks ‘‘are we building the right system’’; Amdahl’s law: A = 1/((1−f)+f/S), assumption: fixed total workload and only fraction f is accelerated; For Q3: U = 2/5 + 1/10 = 0.4 + 0.1 = 0.5; U_bound for n=2 = 2(2^{1/2}−1) ≈ 2(1.4142−1) = 0.8284, so 0.5 ≤ 0.8284 (schedulable under RM assumptions).
Finished this topic? Mark it so your progress, study plan and readiness keep up.
Stuck on something here?