SUK · Third Year B.Tech. Electrical Engineering · NEP 2020
Power System Analysis
EE0363 · Semester VI · 3 credits · ISE 10 + mid-semester 30 + ESE 60
Unit 1: Symmetrical Components and Sequence Networks
6 hoursSymmetrical components of unbalanced phasors, power in terms of symmetrical components; sequence circuits of lines, synchronous machines and transformers; unsymmetrical series impedances.
Examined in the 60-mark end-semester paper, and in the mid-semester exam if it is taught by then
- Symmetrical components
- Sequence impedances and sequence networks
Unit 2: Unsymmetrical Faults
8 hoursSingle line-to-ground, line-to-line, double line-to-ground and open-conductor faults.
Examined in the 60-mark end-semester paper, and in the mid-semester exam if it is taught by then
- Single line-to-ground fault
- Line-to-line fault
- Double line-to-ground fault
- Open conductor faults
Unit 3: Power-Flow Analysis
6 hoursPower-flow equations; Gauss–Seidel, Newton–Raphson, decoupled and fast decoupled methods compared; power-flow software.
Examined in the 60-mark end-semester paper, and in the mid-semester exam if it is taught by then
- Load flow equations and bus classification
- Gauss-Seidel load flow
- Newton-Raphson load flow
- Decoupled and fast decoupled load flow
Unit 4: Power System Stability
6 hoursSteady-state and transient stability, rotor dynamics and the swing equation, equal area criterion, step-by-step swing curves, multimachine stability.
Examined in the 60-mark end-semester paper, and in the mid-semester exam if it is taught by then
- Swing equation
- Equal area criterion
- Step-by-step solution of the swing equation
- Methods to improve stability
Unit 5: Load Frequency Control
8 hoursImportance of LFC, frequency in multimachine systems and in steady state, frequency-dependent loads, speed governors and their characteristics; AGC objectives and implementation.
Examined in the 60-mark end-semester paper, and in the mid-semester exam if it is taught by then
- Load frequency control of an isolated system
- Speed governing and turbine models
- Automatic generation control
Unit 6: Reactive Power Compensation
8 hoursProduction and absorption of reactive power; shunt capacitors, reactors, tap-changing transformers and static VAR compensators.
Examined in the 60-mark end-semester paper, and in the mid-semester exam if it is taught by then
- Reactive power compensation
- Tap-changing transformers and ULTC control
- Synchronous condensers and static VAR systems
Unit contents are summarised from the official SUK syllabus . AiCanCode.org is not affiliated with Shivaji University, Kolhapur.