SPPU · Third Year Electrical Engineering · 2024 Pattern
Power System Engineering II
PCC-351-ELE · Semester VI · 4 credits · CCE 30 + end-semester 70
Unit 1: Power Flow in Long Lines
8 hoursABCD constants of long lines; complex power and power flow from generalised constants; characteristic impedance and surge impedance loading.
Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)
- ABCD constants of long lines
- Power flow using generalised constants
- Surge impedance loading
Unit 2: Per-unit System and Load Flow
8 hoursSingle-line, impedance and reactance diagrams; per-unit quantities, base selection and change of base; network topology, driving-point and transfer admittances; Z-bus and Y-bus by the bus incidence matrix; power-flow equations; bus types; Newton–Raphson load flow for a three-bus system.
Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)
- Single-line and reactance diagrams
- Per-unit system and change of base
- Formation of the Y-bus matrix
- Load flow equations and bus classification
- Newton-Raphson load flow
Unit 3: Symmetrical Faults
7 hoursThree-phase short circuit of an unloaded alternator; subtransient, transient and steady-state currents and reactances; fault current without pre-fault current; choosing circuit breakers and current-limiting reactors.
Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)
- Short circuit of an unloaded alternator
- Subtransient and transient reactances
- Symmetrical fault calculation and short-circuit MVA
- Current-limiting reactors
Unit 4: Unsymmetrical Faults
9 hoursSymmetrical components and power in terms of them; sequence impedances of lines and zero-sequence networks of transformers; L–G, L–L and L–L–G faults on unloaded alternators and simple systems, with and without fault impedance.
Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)
- Symmetrical components
- Sequence impedances and sequence networks
- Single line-to-ground fault
- Line-to-line fault
- Double line-to-ground fault
Unit 5: Reactive Power Compensation and FACTS
8 hoursNeed for reactive power compensation; production and absorption of reactive power; series and shunt compensation; FACTS devices: TCSC and STATCOM, circuits, working, V–I characteristics and applications.
Marks: 14 in the end-semester exam · CCE: Seminar, open-book test or quiz (6 marks, Unit 5)
- Reactive power compensation
- Series and shunt compensation
- FACTS devices
- TCSC and STATCOM
Unit contents are summarised from the official SPPU syllabus . AiCanCode.org is not affiliated with Savitribai Phule Pune University.