SPPU TE Civil syllabus

SPPU · Third Year Civil Engineering · 2024 Pattern

Plumbing Engineering

PEC-362D-CVL · Elective III · Semester VI · 3 credits · CCE 30 + end-semester 70

One of the Elective III options.

All notes for this subject
  1. Unit 1: Plumbing and Codes

    6 hours

    Scope of plumbing and public-health engineering; roles of contractor, plumber and consultant; terminology; UPC-I, ITM and GPCS-I codes and local laws; coordination, shafts, sunken slabs and ledge walls.

    Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)

    • Plumbing engineering and its codes
    • Plumbing terminology and principles
    • Architectural and structural coordination
  2. Unit 2: Water Supply Systems, Pipes and Fixtures

    9 hours

    Supply systems; GI, copper, stainless, HDPE, CPVC, UPVC, PPR and PEX pipes and joints; water hammer; velocity, pressure and temperature limits; WSFU; valves and backflow prevention; tanks; fixtures, water-saving fixtures, heights and spacing.

    Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)

    • Building water supply systems
    • Pipe materials and jointing
    • Water hammer and backflow prevention
    • Water supply fixture units
    • Plumbing fixtures
  3. Unit 3: Sanitary Plumbing and Building Drainage

    9 hours

    Soil, waste and grey-water systems; one- and two-pipe systems; vents and anti-siphonage; drainage fixture units, sizing and testing; cleanouts and inspection chambers; storm water.

    Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)

    • Soil, waste and grey water systems
    • One-pipe and two-pipe systems
    • Drainage fixture units and pipe sizing
    • Testing building drainage
  4. Unit 4: Traps, Vents, Sewers and Disposal

    9 hours

    Traps, seals and primers; vent sizing, wet and stack venting; building sewers, gradients, manholes and gully traps; sumps and pumps; septic tanks; interceptors.

    Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)

    • Traps and trap seals
    • Vent systems
    • Building sewers and manholes
    • Septic tanks and interceptors
  5. Unit 5: Plumbing Design and High-rise Plumbing

    9 hours

    High-rise challenges, hydropneumatic systems, PRVs and break-pressure tanks; rainwater systems; central hot water; drawings, layouts and network design to CPHEEO guidelines.

    Marks: 14 in the end-semester exam · CCE: Seminar, open-book test or quiz (6 marks, Unit 5)

    • High-rise plumbing and pressure zoning
    • Hydropneumatic systems
    • Rainwater and hot water systems
    • Plumbing design drawings

Unit contents are summarised from the official SPPU syllabus . AiCanCode.org is not affiliated with Savitribai Phule Pune University.