SPPU · Third Year Civil Engineering · 2024 Pattern
Construction Chemicals and Water Proofing
PEC-361D-CVL · Elective II · Semester VI · 3 credits · CCE 30 + end-semester 70
One of the Elective II options.
Unit 1: Basics of Waterproofing
9 hoursNeed for waterproofing; basements, podiums, terraces, wet areas, balconies, tanks, lift pits and walls; expansion joints and sealants; selecting materials; maintenance and leakage repair.
Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)
- Need for waterproofing
- Waterproofing terraces, basements and wet areas
- Expansion joints and sealants
Unit 2: Waterproofing Materials
9 hoursOPC, PPC, GGBS and micro-silica; aggregates; polyester, polypropylene, carbon, aramid and glass fibres; geotextiles; admixtures; polymer-modified systems: PVA, SBR, acrylic, epoxy and PUD.
Marks: 14 in the end-semester exam · CCE: Unit test (12 marks, Units 1 & 2)
- Cements and aggregates for waterproofing
- Fibres and geotextiles
- Admixtures and polymer-modified cementitious systems
Unit 3: Coatings and Linings
9 hoursCoatings versus linings; chlorinated rubber, polyurethane, epoxy, polyurea and polysulfide systems; silane–siloxane water repellents.
Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)
- Protective coatings and linings
- Epoxy, polyurethane and polyurea coatings
- Silane–siloxane water repellents
Unit 4: Conventional and Modern Waterproofing
9 hoursBrick-bat coba and box-type waterproofing; polymers, grouting and expansion joints in high-rises; dams, canals, aqueducts, tanks and water-retaining structures; pipeline protection.
Marks: 14 in the end-semester exam · CCE: Assignments or case study (12 marks, Units 3 & 4)
- Brick-bat coba and box-type waterproofing
- Grouting methods
- Expansion joints in high-rise buildings
- Waterproofing water-retaining structures
Unit 5: Waterproofing Practice
9 hoursFailures and remedial treatment in high-rise, industrial and school buildings, tanks, aqueducts, dams, canals and basements; maintenance practice.
Marks: 14 in the end-semester exam · CCE: Seminar, open-book test or quiz (6 marks, Unit 5)
- Waterproofing failures and remedies
- Waterproofing tanks, dams and canals
- Maintenance of waterproofing systems
Unit contents are summarised from the official SPPU syllabus . AiCanCode.org is not affiliated with Savitribai Phule Pune University.