SPPU · Final Year Electrical Engineering · 2019 Course
High Voltage Engineering
403143C · Elective I · Semester VII · 4 credits · In-semester 30 + end-semester 70
One of the Elective I options.
Unit 1: Breakdown in Gases
7 hoursIonisation; Townsend's theory and breakdown criterion; streamer mechanism; Paschen's law; corona in point-plane gaps; time lag; numericals.
Marks: 15 in the in-semester exam
- Townsend's theory of breakdown
- Streamer theory
- Paschen's law
- Corona discharge
Unit 2: Breakdown in Liquid and Solid Dielectrics
7 hoursSuspended particle, cavitation, thermal and stressed-oil theories for liquids; intrinsic, electromechanical, thermal, treeing, tracking and electrochemical breakdown in solids; partial discharge; composite dielectrics.
Marks: 15 in the in-semester exam
- Breakdown in liquid dielectrics
- Breakdown in solid dielectrics
- Treeing and tracking
- Partial discharge
Unit 3: Lightning and Switching Overvoltages
7 hoursLightning strokes and charge separation theories; causes and effects of overvoltages; switching surges and their control; statistical insulation coordination.
Marks: 17–18 in the end-semester exam
- Lightning phenomenon
- Switching surges
- Insulation coordination
Unit 4: Generation of High Voltages and Currents
7 hoursCascaded transformers, resonant circuits and Tesla coils; impulse waveshapes; multistage Marx generators and their triggering; impulse current generation.
Marks: 17–18 in the end-semester exam
- Generation of high AC voltages
- Impulse voltage waveshape
- Marx impulse generator
- Impulse current generation
Unit 5: Measurement of High Voltages and Currents
7 hoursSphere gaps; electrostatic, generating and peak voltmeters; resistive, capacitive and mixed dividers; CVTs; CRO for impulses; dielectric loss and partial discharge measurement; high-current measurement; radio interference.
Marks: 17–18 in the end-semester exam
- Sphere gap measurement
- Potential dividers
- Measurement of impulse voltages
- Dielectric loss and partial discharge measurement
Unit 6: High Voltage Testing and Laboratories
7 hoursTesting insulators, bushings, capacitors, cables and surge arresters; layout, earthing and shielding of HV laboratories.
Marks: 17–18 in the end-semester exam
- Testing of insulators and bushings
- Testing of cables and surge arresters
- High voltage laboratory layout
Unit contents are summarised from the official SPPU syllabus . AiCanCode.org is not affiliated with Savitribai Phule Pune University.