SPPU BE Civil syllabus

SPPU · Final Year Civil Engineering · 2019 Pattern

Rural Water Supply Engineering

401014F · Elective VI · Semester VIII · 3 credits · In-semester 30 + end-semester 70

One of the Elective VI options. The structure table calls it Rural Water Supply and Sanitation.

  1. Unit 1: Rural Water Issues

    6 hours

    Sources by population; reservation of water and permissions; schemes for single and group gram panchayats; GSDA geology certificates; source strengthening, rainwater harvesting, hydro-fracturing and well sinking; yield tests of wells; water quality and quantity.

    Marks: 15 in the in-semester exam

    • Sources for rural water supply
    • Strengthening of water sources
    • Yield tests of wells
  2. Unit 2: Socio-economic Aspects

    6 hours

    Departments in water conservation; participatory approaches; financing schemes; case studies such as Hiware Bazar; capacity building of villagers.

    Marks: 15 in the in-semester exam

    • Participatory rural water supply
    • Financing rural water schemes
  3. Unit 3: Types of Rural Schemes

    6 hours

    Single-village and regional schemes; retrofitting existing infrastructure; components and layout; scour depth for river wells; jack wells, infiltration galleries and percolation wells; rising and gravity mains; WTPs, storage reservoirs and house connections.

    Marks: 17–18 in the end-semester exam

    • Single village and regional schemes
    • Intakes, jack wells and infiltration galleries
    • Rising and gravity mains
  4. Unit 4: Interdisciplinary Aspects

    6 hours

    Electro-mechanical works; hydraulic testing; rising main appurtenances against water hammer and air locks; pump selection and power; economical rising main diameter; pipe materials; residual pressure and HGL; JalTantra software.

    Marks: 17–18 in the end-semester exam

    • Pumps and pumping machinery
    • Economical diameter of rising main
    • Hydraulic grade line and residual pressure
  5. Unit 5: Instrumentation

    6 hours

    Auto pump controllers; water quality sensors; level sensors; hydraulic modelling; SCADA and PLC automation; GPS and GIS; water meters.

    Marks: 17–18 in the end-semester exam

    • Water quality sensors
    • SCADA and PLC in water supply
    • GIS in water supply
  6. Unit 6: Documentation and Maintenance

    6 hours

    As-built drawings; maintenance of pumps and electricals; training villagers in O&M; preventive maintenance; leak detection.

    Marks: 17–18 in the end-semester exam

    • Operation and maintenance of rural schemes
    • Leak detection

Unit contents are summarised from the official SPPU syllabus . AiCanCode.org is not affiliated with Savitribai Phule Pune University.