SPPU BE Civil syllabus

SPPU · Final Year Civil Engineering · 2019 Pattern

Quantity Surveying, Contracts and Tenders

401012 · Semester VIII · 3 credits · In-semester 30 + end-semester 70

All notes for this subject
  1. Unit 1: Estimation and Approximate Estimates

    6 hours

    Purpose and types of estimates; items of work, units and modes of measurement; measurement and abstract sheets; administrative approval and technical sanction; prime cost, provisional sums and contingencies; lead statements; the schedule of rates; approximate estimates of buildings, roads and water works.

    Marks: 15 in the in-semester exam

    • Types of estimates
    • Modes of measurement and bill of quantities
    • Administrative approval and technical sanction
    • Approximate estimates
  2. Unit 2: Tenders, Contracts and Arbitration

    6 hours

    Tendering process; EMD, security deposit and retention; contractor qualification; bid systems; tender evaluation; BOT, global and e-tendering; PWD procedures; valid contracts under the Indian Contract Act; types and conditions of contract; bills and advances; arbitration under the 1996 Act.

    Marks: 15 in the in-semester exam

    • Tendering procedure
    • Evaluation of tenders and e-tendering
    • Types of contracts
    • Conditions of contract and payments
    • Arbitration
  3. Unit 3: Detailed Estimates

    6 hours

    Factors in detailed estimates; PWD and centre-line methods; quantities for load-bearing and RCC framed buildings to IS 1200; bill of quantities; bar bending schedules.

    Marks: 17–18 in the end-semester exam

    • Centre-line method
    • Detailed estimate of buildings
    • Bar bending schedule
  4. Unit 4: Estimates of Other Works

    6 hours

    Earthwork for roads; road works; steel roof trusses; culverts; elevated water tanks.

    Marks: 17–18 in the end-semester exam

    • Earthwork and road estimates
    • Estimates of trusses, culverts and tanks
  5. Unit 5: Specifications and Rate Analysis

    6 hours

    Purpose and types of specifications; detailed specifications for major items; factors in rates, overheads and task work; rate analysis for earthwork, PCC, masonry, RCC, plastering and flooring.

    Marks: 17–18 in the end-semester exam

    • Specifications
    • Rate analysis
  6. Unit 6: Valuation

    6 hours

    Price, cost and value; factors affecting value; income and outgoings; freehold and leasehold; depreciation and obsolescence; sinking fund, years' purchase and annuity; rental, comparison, profit and development methods; rent fixation; belting method for land.

    Marks: 17–18 in the end-semester exam

    • Price, cost and value
    • Depreciation and sinking fund
    • Methods of valuation
    • Rent fixation