SPPU · Final Year Civil Engineering · 2019 Pattern
Formwork and Plumbing Engineering
401004F · Elective IV · Semester VII · 3 credits · In-semester 30 + end-semester 70
One of the Elective IV options.
Unit 1: Introduction to Formwork
6 hoursFormwork as a temporary structure; requirements, selection and types; timber, plywood and steel; aluminium, plastic and FRP formwork; accessories; economy and planning.
Marks: 15 in the in-semester exam
- Types and materials of formwork
- Economy and planning of formwork
Unit 2: Formwork Analysis
6 hoursForms for walls, beams, columns and slabs; dead and live loads; lateral pressure of fresh concrete to IS 14687 and the factors affecting it; allowable stresses and deflection limits; common design deficiencies.
Marks: 15 in the in-semester exam
- Loads on formwork
- Lateral pressure of fresh concrete
- Formwork design criteria
Unit 3: Formwork Design
6 hoursDesign concepts for slab, beam, column and footing formwork; design of slab and wall formwork.
Marks: 17–18 in the end-semester exam
- Design of slab formwork
- Design of wall and column formwork
Unit 4: Introduction to Plumbing
6 hoursWater-borne disease and premise plumbing; plumbing codes and institutions; sustainable plumbing; roles of plumbing designers and plumbers; future challenges.
Marks: 17–18 in the end-semester exam
- Importance of premise plumbing
- Plumbing codes and sustainable practice
Unit 5: Plumbing Hydraulics and Components
6 hoursFriction and minor losses; fixtures and water-efficient fixtures; pipes, fittings, valves and traps; equivalent lengths; water demand of buildings; water supply and drainage systems in buildings.
Marks: 17–18 in the end-semester exam
- Friction and minor losses in pipes
- Plumbing fixtures, valves and traps
- Water demand of buildings
- Building water supply and drainage systems
Unit 6: Plumbing System Design
6 hoursCode limits on pressure and velocity; simultaneous demand; pipe sizing methods; fixture units for supply and drainage; sizing for a three-storey building by the segmented loss method; toilet layouts and plumbing plans.
Marks: 17–18 in the end-semester exam
- Simultaneous demand and fixture units
- Pipe sizing in buildings
- Plumbing layouts and plans
Unit contents are summarised from the official SPPU syllabus . AiCanCode.org is not affiliated with Savitribai Phule Pune University.