RTMNU TY Mechanical syllabus

RTMNU · Third Year B.Tech Mechanical Engineering · NEP 2020

Refrigeration & Air-conditioning

BME6T21A · Elective II · Semester VI · 3 credits · College 30 + university 70

One of the Elective II options.

  1. Unit 1: Vapour Compression and Air Refrigeration

    8 hours

    The vapour compression cycle and the effect of superheating and subcooling; refrigerants, the Montreal and Kyoto protocols, eco-friendly and secondary refrigerants; compressors, evaporators, condensers and expansion devices and cycling controls; air-cycle refrigeration with bootstrap, regenerative and reduced-ambient cycles.

    Examined in the 70-mark end-semester paper

    • Vapour compression cycle
    • Effect of operating conditions on the VCC
    • Refrigerants: designation, ODP and GWP
    • Secondary refrigerants, zeotropes and azeotropes
    • Refrigerant compressors
    • Condensers
    • Evaporators
    • Expansion devices
    • Bootstrap and regenerative air refrigeration
  2. Unit 2: Absorption, Other and Compound Systems

    8 hours

    Aqua-ammonia and lithium bromide absorption systems, steam-jet and thermoelectric refrigeration and the vortex tube; compound refrigeration, multiple-compressor and multiple-evaporator systems.

    Examined in the 70-mark end-semester paper

    • Vapour absorption refrigeration
    • Lithium bromide–water absorption system
    • Steam-jet, thermoelectric and vortex-tube refrigeration
    • Multistage compression with flash intercooling
    • Multi-evaporator systems
  3. Unit 3: Psychrometry and Load Calculation

    8 hours

    Psychrometric properties and processes, classes of air-conditioning systems, thermal comfort, and cooling and heating loads — solar gain, gain through the building structure, design conditions and load calculation methods.

    Examined in the 70-mark end-semester paper

    • Psychrometric properties of air
    • Psychrometric processes and the chart
    • Thermal comfort and indoor air quality
    • Cooling load estimation
    • Inside and outside design conditions
    • Sol-air temperature and CLTD
  4. Unit 4: Air Distribution and AC Systems

    8 hours

    Room air distribution, grilles and diffusers, filters, losses in ducts, duct design and the friction chart, clean rooms and fans; unitary and central all-air, all-water and air–water systems, VRF, chilled ceilings and beams, displacement ventilation, two-stage evaporative cooling and desiccant dehumidification.

    Examined in the 70-mark end-semester paper

    • Air distribution and fans
    • Duct design and pressure losses
    • Duct design methods
    • Room air diffusion and filtration
    • Clean rooms and radiant cooling
    • VRF and VAV systems
    • Evaporative cooling and thermal storage
    • Desiccant air conditioning
  5. Unit 5: Air-Conditioning System Design

    8 hours

    Designing and selecting systems for commercial buildings, supermarkets, hospitals and restaurants; sensing and actuating elements, motors and controls, part-load control, and inverter and double-inverter air conditioners.

    Examined in the 70-mark end-semester paper

    • Air-conditioning system design for buildings
    • Refrigeration controls and safety devices
    • Air-conditioning controls, part-load operation and inverters

Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).