RTMNU · Final Year B.Tech Mechanical Engineering · CBCS
Refrigeration & Air-conditioning
BEME802TC · Elective IV · Semester VIII · 3 credits · College 30 + university 70
One of the Elective IV options.
Unit 1: Vapour Compression and Air Refrigeration
8 hoursThe vapour compression cycle from the reversed Carnot cycle, superheating and subcooling; refrigerants and the Montreal and Kyoto protocols, eco-friendly and secondary refrigerants; compressors, evaporators, condensers and expansion devices; air cycles — bootstrap, regenerative and reduced ambient.
Examined in the 70-mark end-semester paper
- Vapour compression cycle
- Effect of operating conditions on the VCC
- Refrigerants: designation, ODP and GWP
- Secondary refrigerants, zeotropes and azeotropes
- Refrigerant compressors
- Condensers
- Expansion devices
- Bootstrap and regenerative air refrigeration
Unit 2: Absorption, Other and Compound Systems
7 hoursAqua-ammonia and Li-Br absorption, steam-jet, thermoelectric and vortex-tube refrigeration; compound, multi-compressor and multi-evaporator systems with analysis.
Examined in the 70-mark end-semester paper
- Vapour absorption refrigeration
- Lithium bromide–water absorption system
- Steam-jet, thermoelectric and vortex-tube refrigeration
- Multistage compression with flash intercooling
- Multi-evaporator systems
Unit 3: Psychrometry and Load Calculation
8 hoursPsychrometric properties and processes, classes of air-conditioning systems, thermal comfort; sources of heat gain and loss, design conditions and methods of cooling and heating load calculation.
Examined in the 70-mark end-semester paper
- Psychrometric properties of air
- Psychrometric processes and the chart
- Thermal comfort and indoor air quality
- Cooling load estimation
Unit 4: Air Distribution and AC Systems
8 hoursRoom air distribution, grilles, diffusers and filters, duct losses and design methods, clean rooms, fans; unitary, central, all-air, all-water, air–water and VRF systems, chilled ceilings and beams, displacement ventilation, evaporative cooling and desiccant dehumidification.
Examined in the 70-mark end-semester paper
- Room air diffusion and filtration
- Duct design methods
- Air distribution and fans
- Modern HVAC systems
- VRF and VAV systems
- Desiccant air conditioning
- Clean rooms and radiant cooling
Unit 5: Air-Conditioning System Design and Controls
7 hoursDesigning and selecting systems for commercial buildings, supermarkets, hospitals and restaurants; sensing and actuating elements, motors and controls, part-load control and inverter and dual-inverter units.
Examined in the 70-mark end-semester paper
- Air-conditioning system design for buildings
- Air-conditioning controls, part-load operation and inverters
Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).