RTMNU · Final Year B.Tech Electrical Engineering · CBCS
Flexible AC Transmission System (FACTS)
BTCHEE702T · Professional Elective IV · Semester VII · 3 credits · College 30 + university 70
One of the Professional Elective IV options.
Unit 1: FACTS Concept and General System Considerations
8 hoursTransmission interconnection, power flow in an AC system, factors limiting loading capability, power flow and dynamic stability, controllable parameters and FACTS controllers.
Examined in the 70-mark end-semester paper
- Power flow and loading capability of AC interconnections
- Power flow control in parallel paths
- Need for FACTS
- Types of FACTS controllers
Unit 2: Voltage-Source and Current-Source Converters
7 hoursSingle- and three-phase full-wave bridge converters, transformer connections for 12-pulse operation, three-level converters, harmonic elimination and voltage control, and current-source versus voltage-source converters.
Examined in the 70-mark end-semester paper
- Voltage and current source converters
- Twelve-pulse converters and harmonics
- Three-level converters and harmonic elimination
Unit 3: Static Shunt Compensators: SVC and STATCOM
7 hoursObjectives of shunt compensation — midpoint voltage regulation, voltage-instability prevention and transient stability — methods of controllable VAR generation, the SVC and STATCOM compared.
Examined in the 70-mark end-semester paper
- Shunt compensation for midpoint voltage and stability
- Methods of controllable VAR generation
- SVC
- STATCOM
- SVC versus STATCOM
Unit 4: Static Series Compensators: GCSC, TSSC, TCSC and SSSC
7 hoursObjectives of series compensation and transient stability improvement, variable-impedance series compensators and the switching-converter SSSC.
Examined in the 70-mark end-semester paper
- Objectives of series compensation
- GTO thyristor-controlled series capacitor
- Thyristor-switched series capacitor
- TCSC and SSSC
Unit 5: Voltage and Phase Angle Regulators; UPFC and IPFC
7 hoursThyristor-controlled voltage and phase angle regulators, and the operating principles of the unified and interline power flow controllers.
Examined in the 70-mark end-semester paper
- Voltage and phase angle regulators: TCVR and TCPAR
- Unified power flow controller
- Interline power flow controller