RTMNU Final Computer Engg syllabus

RTMNU · Final Year B.Tech Computer Engineering · CBCS

Introduction to Software Testing

BTCME703.3T · Elective V · Semester VII · 3 credits · College 30 + university 70

One of the Elective V options.

All notes for this subject
  1. Unit 1: Fundamentals of Testing

    8 hours

    Testing as an engineering activity and as a process; the role of process in software quality; basic definitions and the principles of software testing; the tester's role in a development organisation; the origins of defects and a defect repository.

    Examined in the 70-mark end-semester paper

    • Software testing: objectives and need
    • Errors, defects and failures
    • Psychology, economics and principles of testing
    • Defect life cycle and bug tracking
  2. Unit 2: Test Case Design Strategies

    7 hours

    Black-box test design — random testing, equivalence class partitioning, state-based testing, cause–effect graphing, error guessing, compatibility, user-documentation and domain testing — and white-box test design.

    Examined in the 70-mark end-semester paper

    • Black-box techniques: boundary values and equivalence partitioning
    • Decision tables, state transitions and cause–effect graphs
    • Random testing, error guessing and domain testing
    • White-box, black-box and grey-box testing
    • Structural coverage testing
  3. Unit 3: Levels of Testing

    7 hours

    The need for levels of testing; unit tests and the test harness; integration and scenario testing, defect bash elimination; system testing and its types; usability and accessibility testing.

    Examined in the 70-mark end-semester paper

    • Levels of testing: unit, integration, system and acceptance
    • System test taxonomy
    • Non-functional testing
    • Usability and accessibility testing
  4. Unit 4: Test Management

    7 hours

    Test planning, test plan components and attachments, locating test items; test management, the test process and reporting results; the test specialist, the skills needed and building a testing group.

    Examined in the 70-mark end-semester paper

    • Test planning and test strategy
    • Test reporting and configuration management
    • Building a testing group and the test specialist
  5. Unit 5: Controlling and Monitoring

    7 hours

    Software test automation, requirements for a test tool and the challenges of automation; test metrics — project, progress and productivity; status meetings, reports and control; criteria for test completion; software configuration management and evaluating software quality.

    Examined in the 70-mark end-semester paper

    • Test automation and frameworks
    • Test monitoring, control and metrics
    • Test cases, test data and entry–exit criteria
    • Quality models, metrics and quality control

Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).