RTMNU Final Civil syllabus

RTMNU · Final Year B.Tech Civil Engineering · CBCS

Precast and Modular Construction Practices

BTCVE703T · Elective V · Semester VII · 3 credits · College 30 + university 70

One of the Elective V options.

  1. Unit 1: Prefabrication and Modular Coordination

    8 hours

    History of precast concrete, materials, framing and standard components, structural behaviour of precast structures, planning a prefabrication plant, IS specifications, economy, modular coordination and standardisation, production, transport and erection.

    Examined in the 70-mark end-semester paper

    • Prefabrication and its economy
    • Site and plant prefabrication
    • Modular coordination and standardisation
    • Structural behaviour of precast framing
    • Precast columns and IS 15916
  2. Unit 2: Precast Structural Members

    7 hours

    Prestressed precast roof members, floor systems and two-way slabs, prestressed beams, precast columns and shear walls, wall panels, hipped plates and shells.

    Examined in the 70-mark end-semester paper

    • Prestressed precast roof and floor members
    • Hollow core slabs
    • Design of precast beams
    • Precast shear walls and wall panels
    • Precast folded plate and shell structures
  3. Unit 3: Large Panel Construction and Joints

    8 hours

    Behaviour of components in large-panel construction — roof and floor slabs, wall panels, columns and shear walls — and joints for structural connections, sealing for waterproofing, non-structural fastenings and expansion joints.

    Examined in the 70-mark end-semester paper

    • Large panel construction
    • Joints in precast construction
    • Sealing and waterproofing precast joints
  4. Unit 4: Production and Hoisting Technology

    7 hours

    Choosing a production set-up, stationary and mobile production, storage, tolerances and accelerated hardening; hoisting and erection equipment and techniques for beams, slabs, wall panels and columns, and vacuum lifting pads.

    Examined in the 70-mark end-semester paper

    • Production of precast elements
    • Storage and tolerances of precast elements
    • Hoisting and erection of precast members
    • Handling and erection stresses
  5. Unit 5: Progressive Collapse

    7 hours

    Progressive collapse, code provisions and equivalent design loads for abnormal effects such as earthquakes and cyclones.

    Examined in the 70-mark end-semester paper

    • Progressive collapse and abnormal loads
    • IS 1893 provisions

Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).