RTMNU · Final Year B.Tech Civil Engineering · CBCS
Design of Hydraulic Structures
BTCVE702T · Elective IV · Semester VII · 3 credits · College 30 + university 70
One of the Elective IV options.
Unit 1: Reservoir Planning and Earthen Dams
7 hoursReservoir investigations, capacities and storage zones, mass inflow and demand curves, reservoir life and river training; earth dams — types, causes of failure, design criteria, components, construction, seepage through the body, the phreatic line, drainage and seepage control, and stability of the foundation.
Examined in the 70-mark end-semester paper
- Reservoir planning and control levels
- Reservoir capacity by mass curve
- Reservoir sedimentation and trap efficiency
- River training works: levees, guide banks and groynes
- Types and components of earth dams
- Failures of earth dams
- Phreatic line and seepage
- Seepage control
Unit 2: Gravity Dams
7 hoursSite selection and design criteria, forces on gravity dams, theoretical and practical profiles, low and high dams, stability analysis, zoning, foundation treatment, construction joints and galleries.
Examined in the 70-mark end-semester paper
- Selection of dam site and type
- Forces on gravity dams
- Elementary profile of a gravity dam
- Low and high gravity dams and the practical profile
- Stability and modes of failure
- Construction of gravity dams
Unit 3: Spillways and Energy Dissipators
7 hoursSpillway components and classification, spillway design flood, cavitation, the ogee spillway, outlets and rating curves, emergency spillways; tail water and jump height curves, spillway gates, canal regulating structures, channel transitions by Hinds' method, Sarda falls and canal troughs.
Examined in the 70-mark end-semester paper
- Types of spillways
- Design of ogee spillway
- Spillway gates
- Energy dissipation and stilling basins
- Channel transitions by Hinds' method
- Canal falls and their types
Unit 4: Structures on Pervious Foundations
7 hoursBligh's creep theory and its limits, Khosla's theory of independent variables and corrections, surface and subsurface weirs, and barrages — waterway, crest levels, impervious floors and protection works.
Examined in the 70-mark end-semester paper
- Bligh's and Lane's theories
- Khosla's theory
- Diversion headworks
- Design of barrages: waterway, crest and impervious floor
Unit 5: Canal Structures
9 hoursModular, semi-modular and non-modular outlets and direct sluices; cross-drainage works — aqueducts, syphon aqueducts, super passages and canal syphons; head and cross regulators.
Examined in the 70-mark end-semester paper
- Canal outlets, escapes and regulators
- Cross-drainage works
- Design of aqueducts and syphon aqueducts
Unit contents are summarised from the official RTMNU syllabus . AiCanCode.org is not affiliated with Rashtrasant Tukadoji Maharaj Nagpur University (RTMNU).