Project Management and Operations Research

MED452 · Semester VIII · 4 credits · CT 20 + theory 80

  1. Unit 1: Introduction; Linear Models

    14 hours

    Development, characteristics, limits, phases and applications of OR; formulating LP models; graphical and simplex methods; Big-M and two-phase methods; duality.

    Examined in the 80-mark end-semester paper

    • Operations research and its methodology
    • Formulating linear programs
    • Graphical method
    • Simplex method
    • Big-M and two-phase methods
    • Duality
  2. Unit 2: Transportation Problems

    6 hours

    Initial solutions and optimality tests; maximisation and minimisation; transshipment; degeneracy.

    Examined in the 80-mark end-semester paper

    • Transportation problem: initial solutions
    • MODI method
  3. Unit 3: Assignment Problems; Replacement Models

    Assignment problems, their variations and the travelling salesman problem; replacement of deteriorating items with and without the time value of money; individual and group replacement.

    Examined in the 80-mark end-semester paper

    • Assignment problem and the Hungarian method
    • Replacement analysis
  4. Unit 4: Queuing Theory; Sequencing

    5 hours

    Queuing models, structure, notation and single- and multi-server models; sequencing n jobs on m machines and two jobs with different orders.

    Examined in the 80-mark end-semester paper

    • Queuing theory and Kendall's notation
    • M/M/1 queues
    • Sequencing jobs through two and three machines
  5. Unit 5: Game Theory; Inventory Models

    8 hours

    Two-person zero-sum games, saddle points, pure and mixed strategies; inventory types, EOQ, price breaks, stochastic inventory and selective inventory control.

    Examined in the 80-mark end-semester paper

    • Two-person zero-sum games
    • Dominance and graphical method in games
    • Deterministic and stochastic inventory models
  6. Unit 6: Network Models

    7 hours

    PERT and CPM in project management; network diagrams, critical path and floats; crashing and optimum duration and cost; PERT time estimates and completion probability.

    Examined in the 80-mark end-semester paper

    • CPM and PERT
    • Project crashing