BAMU Final Year Civil syllabus

BAMU · Final Year B.E. Civil Engineering · CBCS (2019)

Water Resources Engineering II

CED 402 · Semester VII · 4 credits · CT 20 + theory 80

  1. Unit 1: Reservoir Planning

    4 hours

    Types of reservoirs, site investigation and selection, storage capacity by mass curves, fixing control levels, height of dams and their economics.

    Examined in the 80-mark end-semester paper

    • Reservoir capacity by mass curve
    • Reservoir planning and control levels
  2. Unit 2: Gravity and Earthen Dams

    12 hours

    Classification, site selection and instrumentation; forces, failure modes, stability analysis and design of gravity dams, galleries and joints; types, failures, design, seepage control and drainage of earth dams.

    Examined in the 80-mark end-semester paper

    • Classification of dams
    • Dam instrumentation
    • Forces on gravity dams
    • Stability and modes of failure
    • Types and components of earth dams
    • Phreatic line and seepage
    • Seepage control
  3. Unit 3: Arch and Buttress Dams

    Types and suitability, forces and design methods of arch dams; buttress dams and their types.

    Examined in the 80-mark end-semester paper

    • Arch and buttress dams
  4. Unit 4: Spillways; Canals

    6 hours

    Spillway types, construction features, design criteria, energy dissipation and gates; canal classification, alignment and cross-sections, design in non-alluvial soils, Kennedy's and Lacey's silt theories.

    Examined in the 80-mark end-semester paper

    • Types of spillways
    • Energy dissipation and stilling basins
    • Spillway gates
    • Classification of canals
    • Kennedy's theory
    • Lacey's regime theory
  5. Unit 5: Canal Masonry Works

    8 hours

    Cross-drainage works and transitions; canal falls and their design; head and cross regulators; canal modules and their hydraulic design.

    Examined in the 80-mark end-semester paper

    • Cross-drainage works
    • Canal falls and their types
    • Canal outlets, escapes and regulators
  6. Unit 6: Design of Weir Head Works

    4 hours

    Site selection and components of weirs and barrages, design criteria, Bligh's and Khosla's theories, head regulators, under-sluices and divide walls, failure of weirs.

    Examined in the 80-mark end-semester paper

    • Diversion headworks
    • Bligh's and Lane's theories
    • Khosla's theory

Unit contents are summarised from the official BAMU syllabus . AiCanCode.org is not affiliated with Dr. Babasaheb Ambedkar Marathwada University (BAMU).