BAMU Final Year Civil syllabus

BAMU · Final Year B.E. Civil Engineering · CBCS (2019)

Plumbing Engineering

CED 441-B · Elective I · Semester VII · 4 credits · CT 20 + theory 80

One of the Elective I options.

All notes for this subject
  1. Unit 1: Codes and Standards; Hydraulics in Plumbing

    5 hours

    Approvals, minimum standards, prohibited fittings and the plumber's role; pressure and flow in pipes; municipal plumbing laws and fire water needs.

    Examined in the 80-mark end-semester paper

    • Plumbing engineering and its codes
    • Plumbing terminology and principles
  2. Unit 2: Plumbing Fixtures and Fixture Fittings

    7 hours

    Water closets, urinals, flushing devices, lavatories, sinks and other fixtures, water-conserving fixtures, installation standards and minimum facilities.

    Examined in the 80-mark end-semester paper

    • Plumbing fixtures
  3. Unit 3: Traps, Interceptors, Indirect Waste and Vents

    8 hours

    Traps and seals, grease, oil and sand interceptors, indirect waste and air gaps, vent connections, stacks and wet venting, introduction to pipe and vent sizing.

    Examined in the 80-mark end-semester paper

    • Traps and trap seals
    • Septic tanks and interceptors
    • Vent systems
  4. Unit 4: Sanitary and Storm Drainage

    7 hours

    Drainage pipe materials and joints, fixture connections, grading, cleanouts, testing and sumps; storm drains, gutters, roof drains and leaders, and sizing rainwater down-takes.

    Examined in the 80-mark end-semester paper

    • Drainage fixture units and pipe sizing
    • Testing building drainage
    • Storm drainage of buildings
  5. Unit 5: Water Supply; Solar Hot Water

    7 hours

    Potable and reclaimed water, storage, hot and cold distribution, backflow prevention, valves and testing, designing a residential system; solar water heating systems and controls.

    Examined in the 80-mark end-semester paper

    • Building water supply systems
    • Water hammer and backflow prevention
    • Rainwater and hot water systems
  6. Unit 6: Building Sewers; High-Rise Plumbing

    6 hours

    Drainage fixture units, drainage plans, pipes, traps, gully chambers, manholes, sumps and septic tanks; storage tanks, break-pressure tanks and pressure-reducing valves in high-rise buildings.

    Examined in the 80-mark end-semester paper

    • Building sewers and manholes
    • High-rise plumbing and pressure zoning

Unit contents are summarised from the official BAMU syllabus . AiCanCode.org is not affiliated with Dr. Babasaheb Ambedkar Marathwada University (BAMU).