Computer Integrated Manufacturing — formula sheet

Production & Industrial Engineering · GATE PI · SI units. Drafted with Aria, checked by the AiCanCode.org team.

Product cycle and role of CAD/CAM

  • MLT = n_o · (T_su + Q·T_c + T_no) — manufacturing lead time of a batch (h); n_o operations, T_su setup time per operation (h), Q batch size, T_c cycle time per part (h), T_no non-operation time per operation (h).
  • T_p = (T_su + Q·T_c) / Q — average production time per part at one machine (h/part).
  • R_p = 1 / T_p — production rate (parts/h).

Geometric modelling: wireframe, surface and solid

  • V − E + F − L = 2(S − G) — Euler–Poincaré formula for a valid solid; V vertices, E edges, F faces, L inner loops, S shells, G through-holes. Simple solid: V − E + F = 2.
  • P(u) = Σ C(n, i)·uⁱ·(1 − u)ⁿ⁻ⁱ·P_i — Bezier curve of degree n with n + 1 control points P_i (mm), 0 ≤ u ≤ 1.
  • P′(0) = n(P₁ − P₀), P′(1) = n(P_n − P_{n−1}) — end tangent vectors of a Bezier curve.

Geometric transformations

  • T(tx, ty) = [[1, 0, tx], [0, 1, ty], [0, 0, 1]] — 2-D translation (homogeneous coordinates, column vectors, P′ = M·P).
  • R(θ) = [[cos θ, −sin θ, 0], [sin θ, cos θ, 0], [0, 0, 1]] — rotation by θ counter-clockwise about the origin.
  • S(sx, sy) = [[sx, 0, 0], [0, sy, 0], [0, 0, 1]] — scaling about the origin.
  • M = M_n · … · M₂ · M₁ — composite; the first operation M₁ is rightmost.
  • M = T(xₚ, yₚ) · R(θ) · T(−xₚ, −yₚ) — rotation about the point (xₚ, yₚ).

NC and CNC machine tools

  • N = 1000·v / (π·D) — spindle speed (rev/min); v cutting speed (m/min), D diameter (mm).
  • F = N · f_z · z — milling table feed (mm/min); f_z feed per tooth (mm), z teeth. Turning: F = N · f (f in mm/rev).
  • BLU = p / (n_s · r_g) — basic length unit (mm); p screw lead (mm), n_s steps or pulses per motor revolution, r_g motor revolutions per screw revolution.
  • f_p = F · r_g · n_s / (60 · p) — pulse frequency (Hz) for table feed F (mm/min).
  • Accuracy = BLU/2 + 3σ, Repeatability = ±3σ — σ standard deviation of mechanical errors (mm).

Manual CNC part programming: G and M codes

  • G00 rapid, G01 linear interpolation, G02/G03 circular interpolation CW/CCW, G90/G91 absolute/incremental, G41/G42/G40 cutter compensation left/right/cancel — common ISO/Fanuc meanings; check the controller manual.
  • M03/M04/M05 spindle CW/CCW/stop, M06 tool change, M08/M09 coolant on/off, M30 end of program and rewind.
  • Centre = (x_start + I, y_start + J) — arc centre with I, J measured from the arc start point.
  • t = L / F — time of a feed move (min); L path length (mm), arc length L = r·θ (θ in rad).

Computer-aided part programming and CAM

  • h = R − √(R² − (s/2)²) ≈ s² / (8R) — scallop height (mm) for a ball-end mill of radius R (mm) and step-over s (mm).
  • δ = R(1 − cos(θ/2)) — chordal deviation (mm) of a chord subtending θ (rad) on an arc of radius R (mm).
  • θ = 2·arccos(1 − δ/R) — maximum step angle for tolerance δ; segments n = ⌈φ/θ⌉ for an arc of angle φ.

Group technology and part classification coding

  • Row value = Σ a_ij · 2ⁿ⁻ʲ — rank order clustering row weight; a_ij = 1 if machine i processes part j, n parts.
  • Column value = Σ a_ij · 2ᵐ⁻ⁱ — column weight in the current row order; m machines.
  • L / D — length-to-diameter ratio for Opitz digit 1 of rotational parts (0 if ≤ 0.5, 1 if 0.5–3, 2 if ≥ 3).

Computer-aided process planning

  • T_m = π·D·L / (1000·v·f) — turning time per pass (min); D, L in mm, v in m/min, f in mm/rev.
  • C_batch = C_r · (T_su + Q·t_p) — operation cost for a batch (₹); C_r machine-plus-labour rate, consistent time units.
  • Q* = (C_rA·T_suA − C_rB·T_suB) / (C_rB·t_pB − C_rA·t_pA) — break-even batch size between two routes.

Flexible manufacturing systems

  • WL_i = Σ p_j · t_ij — workload of station i (min/part); p_j part-mix fraction, t_ij processing time (min).
  • R_p* = s* / WL* — maximum production rate (parts/min); bottleneck = station with largest WL_i / s_i, s_i servers.
  • U_i = (WL_i / s_i) · R_p* — station utilisation.
  • WL_t = n_t · t_t — transport workload (min/part); n_t moves per part, t_t mean move time.

Automated material handling and storage: AGV, AS/RS

  • T_c = T_L + L_d/v_c + T_U + L_e/v_e — AGV delivery cycle time (min); distances in m, speeds in m/min.
  • R_dv = 60·A·T_f·E / T_c — deliveries per hour per vehicle; A availability, T_f traffic factor, E efficiency.
  • n_c = R_f / R_dv — number of vehicles (round up); R_f required deliveries per hour.
  • T_cs = 2·max(L/v_y, H/v_z) + 2·T_pd — AS/RS single-command cycle time (min).
  • T_cd = 4·max(0.75·L/v_y, 0.75·H/v_z) + 4·T_pd — AS/RS dual-command cycle time (min).
  • R_cs·T_cs + R_cd·T_cd = 60·U — S/R machine time balance; transactions per hour R_cs + 2·R_cd.

Industrial robots: configurations and programming

  • CR = R / (2ⁿ − 1) — control resolution of a joint; R joint range, n bits.
  • Accuracy = CR/2 + 3σ, Repeatability = ±3σ.
  • x = L₁cos θ₁ + L₂cos(θ₁ + θ₂), y = L₁sin θ₁ + L₂sin(θ₁ + θ₂) — two-link planar forward kinematics.
  • cos θ₂ = (x² + y² − L₁² − L₂²) / (2·L₁·L₂) — two-link inverse kinematics (elbow angle).
  • V = (φ/360°)·π·(r₂² − r₁²)·h — work volume of a cylindrical robot (m³).

Programmable logic controllers in manufacturing

  • T_scan = T_in + T_prog + T_out + T_hk — scan time (ms).
  • T_resp,max ≈ T_filter + 2·T_scan + T_outdelay — worst-case input-to-output response (ms).
  • L / v ≥ T_filter + T_scan — condition for reliable detection of a part of length L moving at speed v.
  • M = (START + M) · STOP′ — seal-in (start/stop latch) logic.

Additive manufacturing processes

  • n = H / t — number of layers; H height (mm), t layer thickness (mm).
  • T_build = n · (t_layer + t_recoat) — build time (s).
  • t_layer = A / (h · v) — laser scan time per layer (s); A area (mm²), h hatch spacing (mm), v scan speed (mm/s).
  • Q = w · t · v — extrusion deposition rate (mm³/s); w bead width (mm).
  • c = t · cos θ — staircase height (mm); θ angle between surface normal and build direction.

Industry 4.0 and digital manufacturing

  • OEE = A × P × Q — overall equipment effectiveness; availability × performance × quality (fractions).
  • OEE = good parts × ideal cycle time / planned production time — equivalent shortcut.
  • A_i = MTBF / (MTBF + MTTR) — inherent availability; times in h.
  • D = n · f_s · b — raw sensor data rate (bytes/s); n channels, f_s sampling rate (Hz), b bytes per sample.