Computer Integrated Manufacturing — formula sheet
Production & Industrial Engineering · GATE PI · SI units. Drafted with Aria, checked by the AiCanCode.org team.
Product cycle and role of CAD/CAM
MLT = n_o · (T_su + Q·T_c + T_no)— manufacturing lead time of a batch (h);n_ooperations,T_susetup time per operation (h),Qbatch size,T_ccycle time per part (h),T_nonon-operation time per operation (h).T_p = (T_su + Q·T_c) / Q— average production time per part at one machine (h/part).R_p = 1 / T_p— production rate (parts/h).
Geometric modelling: wireframe, surface and solid
V − E + F − L = 2(S − G)— Euler–Poincaré formula for a valid solid;Vvertices,Eedges,Ffaces,Linner loops,Sshells,Gthrough-holes. Simple solid:V − E + F = 2.P(u) = Σ C(n, i)·uⁱ·(1 − u)ⁿ⁻ⁱ·P_i— Bezier curve of degreenwithn + 1control pointsP_i(mm),0 ≤ u ≤ 1.P′(0) = n(P₁ − P₀),P′(1) = n(P_n − P_{n−1})— end tangent vectors of a Bezier curve.
Geometric transformations
T(tx, ty) = [[1, 0, tx], [0, 1, ty], [0, 0, 1]]— 2-D translation (homogeneous coordinates, column vectors,P′ = M·P).R(θ) = [[cos θ, −sin θ, 0], [sin θ, cos θ, 0], [0, 0, 1]]— rotation byθcounter-clockwise about the origin.S(sx, sy) = [[sx, 0, 0], [0, sy, 0], [0, 0, 1]]— scaling about the origin.M = M_n · … · M₂ · M₁— composite; the first operationM₁is rightmost.M = T(xₚ, yₚ) · R(θ) · T(−xₚ, −yₚ)— rotation about the point(xₚ, yₚ).
NC and CNC machine tools
N = 1000·v / (π·D)— spindle speed (rev/min);vcutting speed (m/min),Ddiameter (mm).F = N · f_z · z— milling table feed (mm/min);f_zfeed per tooth (mm),zteeth. Turning:F = N · f(f in mm/rev).BLU = p / (n_s · r_g)— basic length unit (mm);pscrew lead (mm),n_ssteps or pulses per motor revolution,r_gmotor revolutions per screw revolution.f_p = F · r_g · n_s / (60 · p)— pulse frequency (Hz) for table feedF(mm/min).Accuracy = BLU/2 + 3σ,Repeatability = ±3σ—σstandard deviation of mechanical errors (mm).
Manual CNC part programming: G and M codes
G00rapid,G01linear interpolation,G02/G03circular interpolation CW/CCW,G90/G91absolute/incremental,G41/G42/G40cutter compensation left/right/cancel — common ISO/Fanuc meanings; check the controller manual.M03/M04/M05spindle CW/CCW/stop,M06tool change,M08/M09coolant on/off,M30end of program and rewind.Centre = (x_start + I, y_start + J)— arc centre with I, J measured from the arc start point.t = L / F— time of a feed move (min);Lpath length (mm), arc lengthL = r·θ(θ in rad).
Computer-aided part programming and CAM
h = R − √(R² − (s/2)²) ≈ s² / (8R)— scallop height (mm) for a ball-end mill of radiusR(mm) and step-overs(mm).δ = R(1 − cos(θ/2))— chordal deviation (mm) of a chord subtendingθ(rad) on an arc of radiusR(mm).θ = 2·arccos(1 − δ/R)— maximum step angle for toleranceδ; segmentsn = ⌈φ/θ⌉for an arc of angleφ.
Group technology and part classification coding
Row value = Σ a_ij · 2ⁿ⁻ʲ— rank order clustering row weight;a_ij= 1 if machineiprocesses partj,nparts.Column value = Σ a_ij · 2ᵐ⁻ⁱ— column weight in the current row order;mmachines.L / D— length-to-diameter ratio for Opitz digit 1 of rotational parts (0 if ≤ 0.5, 1 if 0.5–3, 2 if ≥ 3).
Computer-aided process planning
T_m = π·D·L / (1000·v·f)— turning time per pass (min);D,Lin mm,vin m/min,fin mm/rev.C_batch = C_r · (T_su + Q·t_p)— operation cost for a batch (₹);C_rmachine-plus-labour rate, consistent time units.Q* = (C_rA·T_suA − C_rB·T_suB) / (C_rB·t_pB − C_rA·t_pA)— break-even batch size between two routes.
Flexible manufacturing systems
WL_i = Σ p_j · t_ij— workload of stationi(min/part);p_jpart-mix fraction,t_ijprocessing time (min).R_p* = s* / WL*— maximum production rate (parts/min); bottleneck = station with largestWL_i / s_i,s_iservers.U_i = (WL_i / s_i) · R_p*— station utilisation.WL_t = n_t · t_t— transport workload (min/part);n_tmoves per part,t_tmean move time.
Automated material handling and storage: AGV, AS/RS
T_c = T_L + L_d/v_c + T_U + L_e/v_e— AGV delivery cycle time (min); distances in m, speeds in m/min.R_dv = 60·A·T_f·E / T_c— deliveries per hour per vehicle;Aavailability,T_ftraffic factor,Eefficiency.n_c = R_f / R_dv— number of vehicles (round up);R_frequired deliveries per hour.T_cs = 2·max(L/v_y, H/v_z) + 2·T_pd— AS/RS single-command cycle time (min).T_cd = 4·max(0.75·L/v_y, 0.75·H/v_z) + 4·T_pd— AS/RS dual-command cycle time (min).R_cs·T_cs + R_cd·T_cd = 60·U— S/R machine time balance; transactions per hourR_cs + 2·R_cd.
Industrial robots: configurations and programming
CR = R / (2ⁿ − 1)— control resolution of a joint;Rjoint range,nbits.Accuracy = CR/2 + 3σ,Repeatability = ±3σ.x = L₁cos θ₁ + L₂cos(θ₁ + θ₂),y = L₁sin θ₁ + L₂sin(θ₁ + θ₂)— two-link planar forward kinematics.cos θ₂ = (x² + y² − L₁² − L₂²) / (2·L₁·L₂)— two-link inverse kinematics (elbow angle).V = (φ/360°)·π·(r₂² − r₁²)·h— work volume of a cylindrical robot (m³).
Programmable logic controllers in manufacturing
T_scan = T_in + T_prog + T_out + T_hk— scan time (ms).T_resp,max ≈ T_filter + 2·T_scan + T_outdelay— worst-case input-to-output response (ms).L / v ≥ T_filter + T_scan— condition for reliable detection of a part of lengthLmoving at speedv.M = (START + M) · STOP′— seal-in (start/stop latch) logic.
Additive manufacturing processes
n = H / t— number of layers;Hheight (mm),tlayer thickness (mm).T_build = n · (t_layer + t_recoat)— build time (s).t_layer = A / (h · v)— laser scan time per layer (s);Aarea (mm²),hhatch spacing (mm),vscan speed (mm/s).Q = w · t · v— extrusion deposition rate (mm³/s);wbead width (mm).c = t · cos θ— staircase height (mm);θangle between surface normal and build direction.
Industry 4.0 and digital manufacturing
OEE = A × P × Q— overall equipment effectiveness; availability × performance × quality (fractions).OEE = good parts × ideal cycle time / planned production time— equivalent shortcut.A_i = MTBF / (MTBF + MTTR)— inherent availability; times in h.D = n · f_s · b— raw sensor data rate (bytes/s);nchannels,f_ssampling rate (Hz),bbytes per sample.