Microcontrollers, PLC and Industrial Automation — formula sheet

Mechatronics Engineering · GATE ME · SI units. Drafted with Aria, checked by the AiCanCode.org team.

Microcontroller Architecture and Timing

  • T_clk = 1 / f — Clock period (s); f = clock frequency (Hz).
  • T_mc = 12 / f_osc — Machine-cycle time (s) of the classic 8051; f_osc = crystal frequency (Hz). 1 µs at 12 MHz.
  • t_exec = N × CPI / f — Execution time (s); N = instructions executed, CPI = average cycles per instruction.
  • MIPS = f / (CPI × 10⁶) — Millions of instructions per second.
  • RELOAD = f × T_tick − 1 — Cortex-M SysTick reload (counts) for tick period T_tick (s); must not exceed 2²⁴ − 1.

Embedded C: GPIO and Bit Manipulation

  • x | (1 << n) — Sets bit n (bits numbered from 0 at the LSB).
  • x & ~(1 << n) — Clears bit n.
  • x ^ (1 << n) — Toggles bit n.
  • (x >> n) & 1 — Reads bit n.
  • (x & ~(m << p)) | ((v & m) << p) — Writes value v into a k-bit field at position p; m = 2ᵏ − 1.
  • R = (V_CC − V_F) / I_F — LED series resistor (Ω); V_F = LED forward voltage (V), I_F = LED current (A).

Timers, Counters and Interrupts

  • T_tick = N_pre / f_clk — Timer tick (s); N_pre = prescaler, f_clk = timer clock (Hz).
  • T_max = 2ⁿ × T_tick — Longest interval of an n-bit timer (s).
  • Preload = 2ⁿ − T_d / T_tick — Overflow-mode preload for a delay T_d (s).
  • OCR = f_clk / (N_pre × f_int) − 1 — Compare value for an interrupt frequency f_int (Hz) in clear-on-compare (CTC) mode.
  • f_sig = 1 / (Δ × T_tick) — Frequency (Hz) from input capture; Δ = (C₂ − C₁) mod 2ⁿ counts between edges.

Serial Communication: UART, SPI and I2C

  • T_bit = 1 / baud — UART bit time (s); baud in bit/s.
  • t_char = (1 + n_data + n_parity + n_stop) / baud — Time per UART character (s); 10 bit times for 8N1.
  • baud = f_osc / (16 × (UBRR + 1)) — AVR USART baud rate in normal mode; UBRR = baud-rate register value, f_osc = CPU clock (Hz).
  • baud = f_osc / (384 × (256 − TH1)) — Classic 8051 baud rate with Timer 1 in mode 2 and SMOD = 0.
  • t_SPI = 8 × n_bytes / f_SCLK — SPI transfer time (s).
  • t_I2C ≈ 9 × n_bytes / f_SCL — I2C transfer time (s); 8 data bits + ACK per byte, address bytes included.

ADC Interfacing and Sensor Reading

  • LSB = V_ref / 2ⁿ — ADC step size (V); n = resolution in bits, V_ref = reference voltage (V).
  • D = int(V_in × 2ⁿ / V_ref) — Output code (datasheet convention); many textbooks use (V_in / V_ref) × (2ⁿ − 1), which differs by under 1 LSB.
  • V_in ≈ D × V_ref / 2ⁿ — Input voltage (V) from a code D.
  • f_s > 2 f_max — Nyquist sampling condition; f_s = sampling rate, f_max = highest signal frequency (Hz).
  • SNR = 6.02 n + 1.76 — Ideal signal-to-quantisation-noise ratio (dB) of an n-bit ADC.
  • x = x_min + (I − 4) / 16 × (x_max − x_min) — Engineering value from a 4–20 mA signal I (mA).

PWM Generation and Motor Interfacing

  • D = t_on / T — Duty cycle; t_on = high time (s), T = period (s).
  • V_avg = D × V_s — Average output voltage (V); V_s = supply voltage (V).
  • f_PWM = f_clk / (N × (TOP + 1)) — Edge-aligned PWM frequency (Hz); N = prescaler, TOP = period register.
  • ω = (V_avg − I_a R_a) / K_e — DC motor speed (rad/s); I_a = armature current (A), R_a = armature resistance (Ω), K_e = back-EMF constant (V·s/rad).
  • N_rpm = 60 × f_step / steps_per_rev — Stepper speed (rpm); f_step = step rate (steps/s), steps_per_rev = 360° / step angle.

Interfacing Displays, Keypads and Relays

  • Keys = r × c, Pins = r + c — Matrix keypad with r rows and c columns.
  • t_digit = 1 / (N × f_refresh) — On-time per digit (s) of an N-digit multiplexed display refreshed at f_refresh (Hz).
  • I_B = k × I_C / β_min — Base current (A) to saturate a relay-driver transistor; k = overdrive factor (2–5), I_C = coil current (A).
  • R_B = (V_OH − V_BE) / I_B — Base resistor (Ω); V_OH = MCU high-level voltage (V), V_BE ≈ 0.7 V.

Real-Time Operating System Basics

  • U = Σ C_i / T_i — CPU utilisation; C_i = worst-case execution time (s), T_i = period (s) of task i.
  • U ≤ n (2^(1/n) − 1) — Rate-monotonic schedulability bound for n tasks (sufficient only); 0.828 for 2 tasks, 0.780 for 3, → 0.693.
  • R_i = C_i + Σ_(j ∈ hp(i)) ⌈R_i / T_j⌉ × C_j — Response time (s) of task i under fixed priorities; schedulable if R_i ≤ deadline.

PLC Architecture, I/O Modules and Scan Cycle

  • t_scan = t_in + t_prog + t_out + t_hk — Scan time (s): input scan, program execution, output scan, housekeeping.
  • t_resp,max ≈ t_filter + 2 × t_scan + t_out,dev — Worst-case input-to-output response (s); t_filter = input filter, t_out,dev = output device delay.
  • t_pulse,min > t_scan + t_filter — Minimum input pulse width (s) reliably seen by normal scanning.

Ladder Logic: Contacts, Coils, Timers and Counters

  • Motor = (Start + Motor) · Stop_OK · OL_OK — Seal-in (latching) rung; series contacts = AND, parallel = OR.
  • t_set = PV × t_base — Timer delay (s); PV = preset (counts), t_base = time base (s).
  • ET → PT, then Q = 1 — TON output turns on when elapsed time ET reaches preset PT with the input continuously on; remaining time = PT − ET.
  • Q_CTU = 1 when CV ≥ PV — Up-counter output; CV = current count, PV = preset.

Sequential Control and Function Block Programming

  • T_cycle = Σ t_step — Cycle time (s) of a sequence.
  • Throughput = 3600 / T_cycle — Cycles per hour (T_cycle in s).
  • t_fill = A × Δh / Q — Time to change tank level by Δh (m); A = cross-section (m²), Q = flow (m³/s).
  • SR: Q = S + R̄ · Q; RS: Q = R̄ · (S + Q) — Set-dominant and reset-dominant bistables.

PLC Applications: Conveyor, Bottling and Traffic Control

  • t = d / v — Transit time (s) over distance d (m) at belt speed v (m/s).
  • n_counts = d × PPR / (π D) — Encoder counts for belt travel d (m); PPR = pulses per revolution, D = roller diameter (m).
  • T_cycle = max(t_station) + t_index — Cycle time (s) of an indexing line.
  • C = Σ (G_i + A_i + R_i) — Traffic-signal cycle length (s): green, amber and all-red times.

SCADA and HMI

  • t_poll = Σ (t_req + t_resp + t_turn) — Polling cycle (s) over all remote stations.
  • Storage = N_tags × bytes per sample × samples per second × t — Historian storage (bytes) before compression.
  • Clear when x < SP − DB — High-alarm reset with deadband DB below set-point SP.

Industrial Networks: Modbus, Profibus, EtherCAT

  • t_char = n_bits / baud — Serial character time (s); n_bits = 11 for standard Modbus RTU characters.
  • Request = 8 bytes; Response = 5 + 2N bytes — Modbus RTU frames when reading N registers.
  • t_gap = 3.5 × t_char — Minimum Modbus RTU inter-frame silence (s).
  • η = useful bytes / total bytes — Protocol efficiency; effective data rate = η × byte rate.
  • t_cycle ≈ 8 × n_frame / 100 Mbit/s + N_slaves × t_fwd — EtherCAT cycle estimate (s); n_frame in bytes, t_fwd = per-slave forwarding delay.

Industrial IoT and Industry 4.0

  • OEE = A × P × Q — Overall equipment effectiveness, with A, P, Q as fractions (multiply by 100 for %).
  • A = run time / planned production time; P = ideal cycle time × total count / run time; Q = good count / total count — OEE factors.
  • R = N × n_bytes × 8 × f_s — Raw data rate (bit/s) of N sensors sampled at f_s (Hz).
  • I_avg = D × I_active + (1 − D) × I_sleep — Average current (A) of a duty-cycled node; battery life = capacity / I_avg.