Metrology, CIM and Industrial Engineering — formula sheet

Mechatronics Engineering · GATE ME · SI units. Drafted with Aria, checked by the AiCanCode.org team.

Limits, Fits and Tolerances; GD&T Basics

  • Tolerance = Upper limit − Lower limit = ES − EI (hole) = es − ei (shaft) — permitted variation of a size; ES/EI, es/ei = upper/lower deviations of hole/shaft (μm or mm).
  • Maximum clearance = Hole_max − Shaft_min; Minimum clearance (allowance) = Hole_min − Shaft_max — a negative value is interference.
  • i = 0.45·∛D + 0.001·D — standard tolerance unit i (μm), D = geometric mean of the diameter step (mm), D = √(D₁·D₂); ISO system for sizes up to 500 mm.
  • IT6 = 10i, IT7 = 16i, IT8 = 25i, IT9 = 40i, IT10 = 64i, IT11 = 100i — tolerance grades.
  • Virtual condition (hole) = MMC size − geometric tolerance at MMC; Virtual condition (shaft) = MMC size + geometric tolerance at MMC.
  • Bonus tolerance = |Actual size − MMC size| — extra geometric tolerance when the MMC modifier is used.

Linear and Angular Measurement, Comparators and Gauges

  • LC (vernier) = 1 MSD − 1 VSD = s / n — least count; s = value of one main-scale division (mm), n = number of vernier divisions.
  • LC (micrometer) = p / N — p = screw pitch (mm), N = thimble divisions.
  • sin θ = h / L — sine bar; h = slip-gauge height (mm), L = distance between roller centres (mm).
  • Gauge tolerance T_g ≈ 0.1 × T_w; wear allowance W ≈ 0.1 × T_g — T_w = work tolerance (Taylor's principle gauge design).
  • GO plug: H_min + W to H_min + W + T_g; NO-GO plug: H_max − T_g to H_max — H = hole limits.

Surface Finish, Interferometry and Alignment Testing

  • Ra = (1/L)·∫₀ᴸ |y| dx ≈ (1/n)·Σ|yᵢ| — arithmetic mean roughness (μm); yᵢ = ordinate from the mean line.
  • Rq = √((1/n)·Σ yᵢ²) — RMS roughness (μm).
  • Height change per fringe = λ / 2 — optical flat or laser interferometer; λ = wavelength of light (μm).
  • Displacement = N·λ / 2 — N = fringes counted.
  • Rmax = f² / (8r); Ra ≈ f² / (32r) — ideal turned surface; f = feed (mm/rev), r = nose radius (mm).

Coordinate Measuring Machines and Machine Vision Inspection

  • L = √((x₂ − x₁)² + (y₂ − y₁)² + (z₂ − z₁)²) — distance between two probed points (mm).
  • E = A + L / K — CMM length-measuring error (μm); A, K = machine constants, L = measured length (mm).
  • ΔL = L·α·(T − 20) — thermal expansion from the 20 °C reference; α = expansion coefficient (1/°C).
  • Pixel size = FOV / number of pixels across the FOV — object-space resolution of a vision system.

NC and CNC Part Programming

  • N = 1000·V / (π·D) — spindle speed (rpm); V = cutting speed (m/min), D = diameter (mm).
  • F = N·f (turning, drilling); F = N·z·f_z (milling) — feed rate (mm/min); f = feed per rev (mm), z = teeth, f_z = feed per tooth (mm).
  • BLU = p / (n_s·G) — basic length unit (mm per pulse); p = lead-screw pitch (mm), n_s = steps per motor revolution, G = gear ratio (motor rev per screw rev).
  • f_p = (F / p)·G·n_s / 60 — pulse frequency (Hz), F in mm/min.

CAD/CAM, Group Technology and CAPP

  • [x′ y′ 1]ᵀ = T·[x y 1]ᵀ — 2D homogeneous transformation.
  • R(θ) = [[cos θ, −sin θ, 0], [sin θ, cos θ, 0], [0, 0, 1]] — counter-clockwise rotation about the origin.
  • P(u) = Σ C(n, i)·uⁱ·(1 − u)ⁿ⁻ⁱ·Pᵢ, 0 ≤ u ≤ 1 — Bézier curve of degree n.
  • V − E + F = 2 — Euler's rule for a simple polyhedron.

Flexible Manufacturing Systems and Automated Material Handling

  • WLᵢ = Σ t·f·p — workload of station i (min per part); t = process time, f = operation frequency, p = part-mix fraction.
  • Rp* = s* / WL* — maximum production rate at the bottleneck (the largest WLᵢ / sᵢ); s = number of servers.
  • Uᵢ = (WLᵢ / sᵢ)·Rp* — utilisation of station i.
  • Tc = TL + Ld / vc + TU + Le / ve — AGV delivery cycle time (min).
  • nc = Rf / Rdv, rounded up — number of vehicles; Rf = deliveries required per hour, Rdv = deliveries per vehicle per hour.

Additive Manufacturing Processes

  • n = H / t — number of layers; H = part height, t = layer thickness (mm).
  • c = t·cos θ — stair-step cusp height (mm); θ = angle between surface normal and build direction.
  • E = P / (v·h·t) — volumetric energy density (J/mm³) in laser powder bed fusion; P = laser power (W), v = scan speed (mm/s), h = hatch spacing (mm).

Forecasting Methods

  • F(t+1) = (D(t) + … + D(t−n+1)) / n — n-period simple moving average.
  • F(t+1) = α·D(t) + (1 − α)·F(t) — simple exponential smoothing, 0 ≤ α ≤ 1.
  • F = a + b·t; b = (n·Σt·D − Σt·ΣD) / (n·Σt² − (Σt)²); a = D̄ − b·t̄ — least-squares trend line.
  • eₜ = Dₜ − Fₜ; MAD = Σ|eₜ| / N; MSE = Σeₜ² / N; TS = Σeₜ / MAD — forecast error measures and tracking signal.

Aggregate Planning, MRP and Scheduling

  • I(t) = I(t−1) + P(t) − D(t) — inventory balance per period.
  • Net requirement = max(0, gross requirement − on-hand − scheduled receipts + safety stock) — MRP netting; planned order release is offset earlier by the lead time.
  • Lateness Lᵢ = Cᵢ − dᵢ; Tardiness Tᵢ = max(0, Lᵢ) — C = completion time, d = due date. SPT minimises mean flow time; EDD minimises maximum lateness; Johnson's rule minimises makespan for two machines in series.

Inventory Models: EOQ, Quantity Discounts and Safety Stock

  • Q* = √(2DS / H) — economic order quantity (units); D = annual demand (units/year), S = ordering cost (₹/order), H = holding cost (₹/unit/year), H = i·C.
  • TC = (D/Q)·S + (Q/2)·H + C·D — total annual cost; at Q*, ordering cost = holding cost and variable cost = √(2DSH).
  • Q* = √(2DS / (H·(1 − d/p))); I_max = Q*·(1 − d/p) — production (EPQ) model; p = production rate > d = usage rate.
  • ROP = d̄·L + SS — reorder point; d̄ = mean demand per day, L = lead time (days).
  • SS = Z·σ_L, σ_L = σ_d·√L — safety stock; Z from the normal table for the service level (1.645 for 95%), σ_d = std. deviation of daily demand, constant lead time.

Linear Programming: Graphical and Simplex Methods

  • Max Z = Σ cⱼxⱼ subject to Σ aᵢⱼxⱼ ≤ bᵢ, xⱼ ≥ 0 — standard LP.
  • θ = min(bᵢ / aᵢₖ) over aᵢₖ > 0 — minimum ratio test for the leaving variable.
  • Z* = W* — primal and dual optimal values are equal; shadow price = change in Z* per unit increase in bᵢ.

Transportation and Assignment Problems

  • Σ aᵢ = Σ bⱼ — balanced problem; otherwise add a dummy row or column.
  • Basic cells = m + n − 1 — non-degenerate basic feasible solution.
  • uᵢ + vⱼ = cᵢⱼ (occupied cells); dᵢⱼ = cᵢⱼ − (uᵢ + vⱼ) (empty cells) — MODI; optimal for minimisation when all dᵢⱼ ≥ 0.

Network Models: PERT and CPM

  • ES_j = max(EF_i); EF = ES + t; LF_i = min(LS_j); LS = LF − t — forward and backward passes.
  • TF = LS − ES; FF = min(ES of successors) − EF — total and free float.
  • tₑ = (a + 4m + b) / 6; σ² = ((b − a) / 6)² — PERT expected time and variance; a, m, b = optimistic, most likely, pessimistic times.
  • Z = (T_s − T_E) / √(Σσ²) — probability of meeting scheduled time T_s, summing over critical activities.
  • Cost slope = (crash cost − normal cost) / (normal time − crash time) — ₹ per day for crashing.

Queuing Theory: Single-Server Models

  • ρ = λ / μ — utilisation; λ = arrival rate, μ = service rate (same time unit); requires ρ < 1. P₀ = 1 − ρ; Pₙ = (1 − ρ)·ρⁿ; P(N ≥ n) = ρⁿ.
  • L = λ / (μ − λ); Lq = λ² / (μ(μ − λ)) — mean number in system and in queue (M/M/1).
  • W = 1 / (μ − λ); Wq = λ / (μ(μ − λ)) — mean time in system and in queue.
  • L = λ·W; Lq = λ·Wq — Little's law.
  • Lq = ρ² / (2(1 − ρ)) — M/D/1 (constant service time).

Statistical Quality Control and Control Charts

  • X̄ chart: X̿ ± A₂·R̄; R chart: UCL = D₄·R̄, LCL = D₃·R̄ — A₂, D₃, D₄ from the SQC table for subgroup size n.
  • X̄ chart with known σ: μ ± 3σ / √n.
  • σ̂ = R̄ / d₂ — process standard deviation estimate.
  • p chart: p̄ ± 3·√(p̄(1 − p̄) / n); np chart: n·p̄ ± 3·√(n·p̄(1 − p̄)); c chart: c̄ ± 3·√c̄ — negative LCL is set to 0.
  • Cp = (USL − LSL) / (6σ); Cpk = min[(USL − μ) / (3σ), (μ − LSL) / (3σ)] — process capability; Cpk ≤ Cp.