Engineering Materials and Manufacturing Processes — formula sheet

Mechatronics Engineering · GATE ME · SI units. Drafted with Aria, checked by the AiCanCode.org team.

Crystal structure, defects and mechanical properties of metals

  • ρ = n·A / (a³·N_A) — theoretical density (kg/m³ or g/cm³); n: atoms per unit cell (SC 1, BCC 2, FCC 4); A: atomic mass (g/mol); a: lattice parameter; N_A = 6.022 × 10²³ mol⁻¹; cubic crystals.
  • a = 4r/√3 (BCC), a = 2√2·r (FCC), a = 2r (SC) — r: atomic radius; atoms touch along the body diagonal (BCC) or face diagonal (FCC).
  • APF = n·(4/3)·π·r³ / a³ — atomic packing factor: SC 0.52, BCC 0.68, FCC and HCP 0.74.
  • σ_y = σ₀ + k·d^(−1/2) — Hall–Petch: σ_y yield strength (MPa); σ₀ friction stress (MPa); k locking parameter (MPa·m^0.5); d grain diameter (m).
  • σ = F/A₀, ε = ΔL/L₀, E = σ/ε — engineering stress (Pa), strain (dimensionless), Young's modulus (Pa); E applies in the elastic region only.
  • σ_T = σ·(1 + ε), ε_T = ln(1 + ε) — true stress and true strain; valid up to the onset of necking.
  • U_r = σ_y² / (2E) — modulus of resilience (J/m³).

Iron-carbon diagram, steels and cast irons

  • Key points: eutectoid 727 °C, 0.76 % C (γ → α + Fe₃C, pearlite); eutectic 1147 °C, 4.3 % C (L → γ + Fe₃C, ledeburite); peritectic 1495 °C, 0.17 % C (L + δ → γ); max C in ferrite 0.022 %, in austenite 2.14 %; cementite 6.67 % C.
  • W_β = (C₀ − C_α) / (C_β − C_α) — lever rule: mass fraction of phase β in a two-phase field; C₀ alloy composition, C_α and C_β tie-line end compositions (wt%).
  • W_pearlite = (C₀ − 0.022) / (0.76 − 0.022) — hypoeutectoid steel just below 727 °C.
  • W_pearlite = (6.67 − C₀) / (6.67 − 0.76) — hypereutectoid steel just below 727 °C.
  • CE = C + (Si + P)/3 — carbon equivalent of cast iron (wt%); CE ≈ 4.3 is eutectic.
  • CE_IIW = C + Mn/6 + (Cr + Mo + V)/5 + (Ni + Cu)/15 — carbon equivalent for weldability of steels (wt%); higher CE means greater risk of hydrogen cracking and need for preheat.

Heat treatment and surface hardening of steels

  • x ∝ √(D·t) — case depth x (m) at fixed temperature; D diffusion coefficient (m²/s); t time (s). Doubling depth needs four times the time.
  • (C_s − C_x) / (C_s − C₀) = erf( x / (2·√(D·t)) ) — Fick's second-law solution for carburising a semi-infinite solid at constant surface carbon C_s; C₀ initial carbon; C_x carbon at depth x (wt%).
  • D = D₀·exp(−Q / (R·T)) — D₀ (m²/s), Q activation energy (J/mol), R = 8.314 J/(mol·K), T in K; D₀ and Q from the data book.
  • δ = 503·√( ρ / (μ_r·f) ) — induction skin depth (m); ρ resistivity (Ω·m); μ_r relative permeability (1 above the Curie point); f frequency (Hz).

Smart materials: piezoelectric, shape memory alloys

  • D = d·T + ε^T·E — direct piezoelectric effect: D electric displacement (C/m²); d charge coefficient (C/N); T stress (Pa); ε^T = ε_r·ε₀ permittivity (F/m), ε₀ = 8.854 × 10⁻¹² F/m; E field (V/m).
  • S = s^E·T + d·E — converse effect: S strain; s^E compliance (m²/N).
  • Q = d₃₃·F — charge (C) from axial force F (N) on a thickness-mode element.
  • C = ε^T·A / t, V = Q / C — element capacitance (F), open-circuit voltage (V); A electrode area (m²), t thickness (m).
  • g₃₃ = d₃₃ / ε₃₃^T, V = g₃₃·σ·t — voltage coefficient (V·m/N).
  • Δ = n·d₃₃·V — free stroke (m) of an n-layer stack driven at V volts per layer.
  • k² = d² / (s^E·ε^T) — electromechanical coupling factor.
  • F = σ_r·π·d_w² / 4, δ = ε_r·L — SMA wire force (N) and stroke (m); σ_r recovery stress (Pa) and ε_r design recoverable strain from supplier data; L active length (m).

Sand casting: patterns, moulds, gating and risers

  • Pattern size = (casting size + machining allowance) × (1 + shrinkage allowance) — allowances from the foundry data book; draft is added separately.
  • v = √(2·g·h) — velocity at the sprue base (m/s); h effective head (m); g = 9.81 m/s².
  • A_top·√h_top = A_bottom·√h_bottom — sprue taper from continuity to avoid aspiration.
  • t_f = V / (A_g·√(2·g·h_t)) — mould filling time (s), top gating; V mould volume (m³); A_g gate (choke) area (m²); h_t sprue height (m).
  • t_f = (A_m / A_g)·(2 / √(2·g))·(√h_t − √(h_t − h_m)) — filling time, bottom gating; A_m mould cross-section (m²); h_m mould height (m).
  • M = V / A, M_riser ≥ 1.2·M_casting — casting modulus (m); riser sized so it freezes after the casting (modulus method).

Solidification time and special casting processes

  • t_s = B·(V/A)ⁿ — Chvorinov's rule: t_s solidification time (s); B mould constant (s/m², for n = 2); V volume (m³); A cooling surface area (m²); n ≈ 2.
  • t₂ / t₁ = (M₂ / M₁)² — ratio of solidification times for the same metal and mould.
  • d = k·√t — solidified skin thickness (m) after time t (s); k solidification constant (m/s^0.5).
  • G = ω²·R / g, N = (60 / 2π)·√(G·g / R) — centrifugal casting: G-factor (dimensionless); ω (rad/s); R inner radius of casting (m); N (rpm).

Bulk forming: forging, rolling, extrusion and drawing

  • ε = ln(A₀/A_f) = ln(h₀/h_f) — true strain; plane-strain rolling uses thickness.
  • σ̄_f = K·εⁿ / (1 + n) — average flow stress (Pa); K strength coefficient (Pa); n strain-hardening exponent.
  • Δh_max = μ²·R, L = √(R·Δh) — maximum draft (m) and projected contact length (m) in rolling; R roll radius (m); μ friction coefficient.
  • F = σ̄_f·w·L — roll separating force (N), friction neglected; w strip width (m).
  • T = 0.5·F·L (per roll), P = 2π·N·F·L / 60 (both rolls) — torque (N·m) and power (W); N roll speed (rpm).
  • p_avg = σ_f·(1 + 2μr / (3h)), F = p_avg·π·r² — open-die upsetting of a cylinder of radius r and height h with sliding friction.
  • σ_d = σ̄_f·ln(A₀/A_f), F_d = σ_d·A_f — ideal (frictionless) wire or rod drawing stress and force; maximum ideal reduction 63.2 % (σ_d = σ_f).
  • p = σ̄_f·ln R, F = p·A₀ — ideal extrusion pressure (Pa) and force (N); R = A₀/A_f extrusion ratio; A₀ billet area.

Sheet metal operations: blanking, bending and deep drawing

  • F_s = L·t·τ — blanking or punching force (N); L cut perimeter (m); t thickness (m); τ shear strength (Pa).
  • c = a·t — radial clearance per side (m); a allowance from the data book. Blanking: die = blank size, punch = die − 2c. Punching: punch = hole size, die = punch + 2c.
  • BA = α·(R + K·t) — bend allowance (m); α bend angle (rad); R inside bend radius (m); K neutral-axis factor (≈ 0.33 for R < 2t, ≈ 0.5 for R ≥ 2t).
  • F_b = K_b·σ_u·w·t² / D — bending force (N); K_b die factor (≈ 1.33 for V-die, 0.33 for wiping die); σ_u UTS (Pa); w bend length (m); D die opening (m).
  • D = √(d² + 4·d·h) — blank diameter (m) for a cylindrical cup of diameter d and height h, sharp corners, thickness constant.
  • DR = D / d, r = (D − d) / D — drawing ratio (limit about 2.0 for first draw) and reduction.
  • F_d = π·d·t·σ_u·(D/d − 0.7) — empirical deep-drawing force (N).

Powder metallurgy

  • ρ_rel = ρ / ρ_th, Porosity = 1 − ρ / ρ_th — relative density and porosity; ρ_th theoretical (pore-free) density.
  • m = ρ_g·V_g = ρ_s·V_s — mass is conserved between green (g) and sintered (s) compacts.
  • Volumetric shrinkage = 1 − ρ_g / ρ_s, Linear shrinkage = 1 − (ρ_g / ρ_s)^(1/3) — isotropic shrinkage on sintering.
  • F = p·A — press force (N) for compaction pressure p (Pa) on projected area A (m²).

Arc, gas and resistance welding; heat input

  • H = η·V·I / v — net heat input per unit length (J/m); η arc (heat-transfer) efficiency, typically 0.6–0.9 depending on process; V arc voltage (V); I current (A); v travel speed (m/s).
  • H (kJ/mm) = 60·V·I / (1000·S) — gross heat input with S in mm/min (multiply by η for net).
  • V = A + B·l — arc voltage (V) versus arc length l (mm); A and B from the power-source data.
  • V = V_o − (V_o / I_s)·I — linear drooping power-source characteristic; V_o open-circuit voltage; I_s short-circuit current.
  • Q = I²·R·t — resistance-welding heat (J); R contact plus bulk resistance (Ω); t weld time (s).
  • η_m = u·A_w·v / (η·V·I) — melting efficiency; u energy to melt unit volume (J/m³); A_w weld bead cross-section (m²).

Solid-state welding, brazing and soldering

  • T = (2/3)·μ·F·R — friction torque (N·m) on a solid circular face of radius R (m) under axial force F (N), uniform pressure.
  • P = T·ω, ω = 2πN / 60 — friction-welding power (W).
  • P_joint = τ_f·A_lap — strength of a brazed or soldered lap joint (N); τ_f filler shear strength (Pa); A_lap overlap area (m²).
  • L = σ_t·t / τ_f — lap length (m) for the joint to be as strong as the sheet of thickness t and tensile strength σ_t.
  • Q = m·c·ΔT — sensible heat (J) to bring a part to brazing temperature (add latent heat if any metal melts).

Mechanics of orthogonal cutting and Merchant's circle

  • r = t / t_c = V_c / V = l_c / l — chip thickness ratio (< 1).
  • tan φ = r·cos α / (1 − r·sin α) — shear angle φ; α rake angle.
  • F = F_c·sin α + F_t·cos α, N = F_c·cos α − F_t·sin α, μ = tan β = F / N — friction force and normal force on the rake face; β friction angle.
  • F_s = F_c·cos φ − F_t·sin φ, F_n = F_c·sin φ + F_t·cos φ — shear-plane forces.
  • F_c = R·cos(β − α), F_t = R·sin(β − α), F_s = R·cos(φ + β − α) — R resultant tool force.
  • A_s = b·t / sin φ, τ_s = F_s / A_s — shear-plane area and shear stress; b width of cut.
  • 2φ + β − α = 90° — Merchant's shear-angle relation (minimum energy).
  • V_c = V·sin φ / cos(φ − α), V_s = V·cos α / cos(φ − α) — chip and shear velocities.
  • γ = cot φ + tan(φ − α) — shear strain.
  • P = F_c·V, u = F_c / (b·t) — cutting power (W) and specific cutting energy (J/m³).

Tool wear, tool life and machinability

  • V·T^n = C — Taylor's equation: V cutting speed (m/min); T tool life (min); n exponent (dimensionless, typically about 0.1–0.15 HSS, 0.2–0.3 carbide, 0.4–0.6 ceramic; take from test data); C speed for 1 min life (m/min). Valid for one tool–work pair, fixed feed and depth.
  • n = ln(V₂/V₁) / ln(T₁/T₂) — exponent from two tests.
  • T₂ = T₁·(V₁/V₂)^(1/n) — tool life at a new speed.
  • V·T^n·f^a·d^b = C — extended Taylor equation; f feed (mm/rev), d depth of cut (mm), a and b empirical.
  • T_c = (1/n − 1)·(t_c + C_t/C_m) — tool life for minimum cost; t_c tool-change time (min); C_t cost per cutting edge; C_m machine-and-labour cost rate per min.
  • T_p = (1/n − 1)·t_c — tool life for maximum production rate.
  • Machinability index (%) = (V_test / V_reference) × 100 — speeds for the same tool life.

Turning, milling, drilling and grinding; machining time

  • N = 1000·V / (π·D) — spindle speed (rpm); V (m/min); D (mm).
  • t = (L + A + O) / (f·N) — time per pass (min) in turning or drilling; L length of cut, A approach, O over-travel (mm); f feed (mm/rev).
  • MRR = π·D_avg·d·f·N ≈ 1000·V·f·d — turning MRR (mm³/min); d depth of cut (mm); D_avg mean diameter (mm).
  • t = (D/2) / (f·N) — facing time (min) from outside to centre at constant N.
  • Drill tip allowance = (D/2)·cot(θ/2) — θ point angle (118° gives about 0.3D).
  • MRR = (π·D²/4)·f·N — drilling into solid (mm³/min).
  • f_m = f_z·Z·N — milling table feed (mm/min); f_z feed per tooth (mm); Z number of teeth.
  • t = (L + A + O) / f_m, A = √(d·(D − d)) — milling time (min) and slab-milling approach (mm); D cutter diameter.
  • MRR = w·d·f_m — milling MRR (mm³/min); w width of cut (mm).
  • P = u·MRR — cutting power (W) with u specific cutting energy (J/mm³, data book) and MRR in mm³/s.

Jigs and fixtures

  • 3 + 2 + 1 = 6 — the 3-2-1 principle: 3 locators on the primary face, 2 on the secondary, 1 on the tertiary arrest all six degrees of freedom.
  • W ≥ n·F / (k·μ) — clamping force (N) to resist a sliding force F (N) by friction alone; μ friction coefficient; k number of friction interfaces (1 or 2); n factor of safety (about 1.5–3). Prefer directing cutting forces into fixed locators.
  • h = D / (2·sin(α/2)) — height of a cylinder's axis above the V-block vertex; D diameter; α included V angle.
  • Δh = ΔD / (2·sin(α/2)) — vertical location error of the axis due to diameter variation ΔD.

Non-traditional machining: EDM, ECM, USM, LBM, AJM

  • ṁ = η·I·A / (v·F) — ECM mass removal rate (g/s); η current efficiency; I current (A); A atomic mass (g/mol); v valency; F = 96 485 C/mol.
  • Q = η·I·A / (v·F·ρ) — ECM volumetric MRR (cm³/s); ρ density (g/cm³).
  • f = η·J·A / (v·F·ρ) — ECM equilibrium tool feed (cm/s); J current density (A/cm²).
  • A/v (alloy) = 1 / Σ(x_i·v_i/A_i) — effective electrochemical equivalent of an alloy; x_i mass fraction.
  • V_c = V₀·(1 − e^(−t/RC)) — EDM RC (relaxation) circuit capacitor voltage while charging; V₀ supply voltage; R (Ω); C (F).
  • E_s = ½·C·V_d², P = E_s / t_c — energy per spark (J) at discharge voltage V_d, and average power (W) for charging time t_c.
  • v_max = 2·π·f·a — USM peak tool velocity (m/s); f frequency (Hz); a amplitude (m).
  • Power density = P / (π·d²/4) — LBM power density (W/m²); P beam power (W); d spot diameter (m).

Plastic processing: injection moulding and extrusion

  • F_clamp = p_c·A_p — clamping force (N); p_c average cavity pressure (Pa, typically 20–100 MPa by material); A_p projected area of part plus runners (m²).
  • t_c = (s² / (π²·α))·ln[(4/π)·(T_m − T_w)/(T_e − T_w)] — cooling time (s) of a plate cooled from both faces; s wall thickness (m); α thermal diffusivity (m²/s, about 1 × 10⁻⁷ for polymers); T_m melt, T_w mould wall, T_e ejection temperature.
  • D_c = D_p / (1 − S) ≈ D_p·(1 + S) — cavity dimension from part dimension and fractional shrinkage S (supplier data).
  • Q_d = ½·π²·D²·N·h·sin φ·cos φ — extruder drag flow (m³/s); D screw diameter (m); N speed (rev/s); h channel depth (m); φ helix angle (17.66° for square pitch).
  • Q_p = π·D·h³·sin²φ·Δp / (12·η·L) — pressure back-flow (m³/s); Δp die head pressure (Pa); η melt viscosity (Pa·s); L metering length (m).
  • Q = Q_d − Q_p — net extruder output; the operating point is where it meets the die characteristic Q = K_s·Δp.