Introduction to Industrial Engineering
Material yield = (Mass in conforming output / Mass of input material) * 100— percentage of input material incorporated in conforming products; mass in consistent units.
Work Study and Method Study
Standard Time = Normal Time + Allowances— total time allowed for a task; seconds or minutes; includes allowances for rest, fatigue, and delays.Normal Time = Observed Time × Performance Rating— time adjusted for performance; seconds or minutes; observed time multiplied by a performance-rating factor.
Time Study and Work Measurement
Normal Time = Observed Time × Performance Rating— time adjusted for performance; seconds or minutes; observed time multiplied by a performance-rating factor.Standard Time = Normal Time + Allowances— total time allowed for a task; seconds or minutes; includes allowances for rest, fatigue, and delays.
Production Planning and Control
Production Rate = Total Output / Total Time— rate of production; units per hour; total output divided by total time.Utilization = (Actual Output / Design Capacity) * 100— percentage of design capacity achieved; units.
Inventory Control
EOQ = sqrt((2 * D * S) / H)— Economic Order Quantity; units; optimal order quantity minimizing total inventory costs.ROP = d * L + safety stock— Reorder Point; units; level at which new order should be placed.Safety Stock = Z * σd * sqrt(L)— additional stock to prevent stockouts; units; based on demand variability and lead time.
Forecasting Techniques
SMA = (D1 + D2 + ... + Dn) / n— Simple Moving Average; units; average demand over n periods.Ft = α * Dt-1 + (1 - α) * Ft-1— Exponential Smoothing; units; forecast for current period based on previous demand and forecast.
Quality Control and Assurance
Cp = (USL - LSL) / (6σ)— Process capability index; dimensionless; measures process potential.Cpk = min((USL - μ) / (3σ), (μ - LSL) / (3σ))— Adjusted process capability index; dimensionless; accounts for mean shift.
Operations Research
Z = c1*x1 + c2*x2 + ... + cn*xn— Objective function value; units depend on model; linear combination of decision variables.Mean service time = 1 / μ— average time per service; time units; reciprocal of service rate.
Linear Programming
Z = c₁x₁ + c₂x₂ + ... + cₙxₙ— Objective function value; units depend on context; linear combination of decision variables.a₁x₁ + a₂x₂ + ... + aₙxₙ ≤ b— Constraints; units depend on context; linear inequalities limiting decision variables.