Introduction to Industrial Engineering

  • Material yield = (Mass in conforming output / Mass of input material) * 100 — percentage of input material incorporated in conforming products; mass in consistent units.

Work Study and Method Study

  • Standard Time = Normal Time + Allowances — total time allowed for a task; seconds or minutes; includes allowances for rest, fatigue, and delays.
  • Normal Time = Observed Time × Performance Rating — time adjusted for performance; seconds or minutes; observed time multiplied by a performance-rating factor.

Time Study and Work Measurement

  • Normal Time = Observed Time × Performance Rating — time adjusted for performance; seconds or minutes; observed time multiplied by a performance-rating factor.
  • Standard Time = Normal Time + Allowances — total time allowed for a task; seconds or minutes; includes allowances for rest, fatigue, and delays.

Production Planning and Control

  • Production Rate = Total Output / Total Time — rate of production; units per hour; total output divided by total time.
  • Utilization = (Actual Output / Design Capacity) * 100 — percentage of design capacity achieved; units.

Inventory Control

  • EOQ = sqrt((2 * D * S) / H) — Economic Order Quantity; units; optimal order quantity minimizing total inventory costs.
  • ROP = d * L + safety stock — Reorder Point; units; level at which new order should be placed.
  • Safety Stock = Z * σd * sqrt(L) — additional stock to prevent stockouts; units; based on demand variability and lead time.

Forecasting Techniques

  • SMA = (D1 + D2 + ... + Dn) / n — Simple Moving Average; units; average demand over n periods.
  • Ft = α * Dt-1 + (1 - α) * Ft-1 — Exponential Smoothing; units; forecast for current period based on previous demand and forecast.

Quality Control and Assurance

  • Cp = (USL - LSL) / (6σ) — Process capability index; dimensionless; measures process potential.
  • Cpk = min((USL - μ) / (3σ), (μ - LSL) / (3σ)) — Adjusted process capability index; dimensionless; accounts for mean shift.

Operations Research

  • Z = c1*x1 + c2*x2 + ... + cn*xn — Objective function value; units depend on model; linear combination of decision variables.
  • Mean service time = 1 / μ — average time per service; time units; reciprocal of service rate.

Linear Programming

  • Z = c₁x₁ + c₂x₂ + ... + cₙxₙ — Objective function value; units depend on context; linear combination of decision variables.
  • a₁x₁ + a₂x₂ + ... + aₙxₙ ≤ b — Constraints; units depend on context; linear inequalities limiting decision variables.