  • F_max = L · t · τ_s — peak blanking/piercing force (N); L = cut perimeter (mm), t = sheet thickness (mm), τ_s = shear strength (MPa); for a circle L = π·d.
  • c = 0.0032 · t · √τ_s — empirical clearance per side (mm), t in mm, τ_s in MPa. Blanking: die = blank size, punch = blank − 2c. Piercing: punch = hole size, die = hole + 2c.
  • F_shear = F_max · (p · t) / s — peak force with shear s (mm) ground on punch/die; p = fractional penetration at fracture; valid for s ≥ p·t.
  • W = F_max · p · t — shearing work (N·mm); unchanged by shear.
  • D = √(d² + 4·d·h) — blank diameter (mm) for a cylindrical cup of diameter d and height h (thin sheet, sharp corners).
  • F_d = π · d · t · σ_u · (D/d − C) — drawing force (N); σ_u = UTS (MPa); C ≈ 0.6–0.7 (empirical). Limiting draw ratio D/d ≈ 1.8–2.0 for mild steel.

Body Shop: Spot Welding and Robotic Welding Lines

  • Q = I² · R · t — heat generated (J); I = current (A), R = total resistance (Ω), t = weld time (s). Average power P = I² · R (W).
  • Q_m = (π/4) · d_n² · h_n · u_m — heat to melt the nugget (J); d_n, h_n = nugget diameter and thickness (mm), u_m = melting energy per unit volume (J/mm³).
  • η = Q_m / Q — thermal efficiency of the weld.
  • T_takt = available time / required output; n_robots = ⌈ N_w · t_w / (T_takt − t_h) ⌉ — N_w = welds per station, t_w = time per weld (s), t_h = transfer/clamp time (s).

Paint Shop: Pretreatment, Electrocoating and Topcoat

  • DFT = WFT · VS — dry film thickness from wet film thickness and volume-solids fraction.
  • V_spray = A · DFT / (VS · TE) — paint volume to spray (m³); A = area (m²), DFT (m), TE = transfer efficiency.
  • SR_th = 10 · VS% / DFT(μm) — theoretical spreading rate (m²/L).
  • m_film = ρ_f · A · t_f; Q_e = m_film / Y — e-coat film mass (kg) and charge (C); Y = coulombic yield (mg/C, supplier data).
  • Q_oven = m_b · c · ΔT — heat to bring the body to bake temperature (J).

Final Assembly Line and Line Balancing

  • T_takt = T_available / Q — takt time (s/unit).
  • N_min = ⌈ Σt_i / C ⌉ — minimum number of stations; C = cycle time (s).
  • η_L = Σt_i / (N · C); d = 1 − η_L — line efficiency and balance delay.
  • SI = √( Σ (S_max − S_k)² ) — smoothness index (s).
  • Production rate = 1 / (largest station time).

Manufacture of Engine Blocks, Crankshafts and Gears

  • t_s = B · (V / A)² — Chvorinov's rule; t_s = solidification time (s), V/A = modulus (mm), B = mould constant (s/mm²).
  • N = 1000 · V_c / (π · D) — spindle speed (rpm); V_c (m/min), D (mm).
  • T_m = (L + L_a) / (f · N) — machining time (min); f = feed (mm/rev).
  • d = m · Z, d_a = m · (Z + 2), h = 2.25 · m — gear pitch diameter, tip diameter, whole depth (mm).
  • T_hob = (b + L_a) · Z / (f_a · N_h · k) — hobbing time (min); b = face width, f_a = axial feed per work rev, N_h = hob rpm, k = hob starts.

Forecasting Methods for Demand Planning

  • F_(t+1) = (D_t + … + D_(t−n+1)) / n — simple moving average.
  • F_(t+1) = Σ w_i · D_i, Σ w_i = 1 — weighted moving average.
  • F_(t+1) = α · D_t + (1 − α) · F_t — simple exponential smoothing, 0 < α < 1.
  • b = (nΣxy − ΣxΣy) / (nΣx² − (Σx)²), a = (Σy − bΣx) / n — least-squares line D = a + b·x.
  • MAD = Σ|e_t| / n, MSE = Σe_t² / n, TS = Σe_t / MAD — error measures; e_t = D_t − F_t.

Aggregate Planning, MRP and Scheduling

  • P_level = (Σ D_t + I_end − I_0) / T — level production rate.
  • I_t = I_(t−1) + P_t − D_t — inventory balance.
  • NR_t = max(0, GR_t − OH_(t−1) − SR_t) — MRP net requirement; planned order release = planned receipt offset by lead time; GR_child = POR_parent × q.
  • F_j = Σ p_i, L_j = F_j − d_j, T_j = max(0, L_j) — flow time, lateness, tardiness. SPT minimises mean flow time; EDD minimises maximum lateness; Johnson's rule minimises two-machine makespan.

Inventory Models: EOQ, Quantity Discounts and Safety Stock

  • Q* = √(2·D·S / H) — EOQ (units); D = annual demand (units/yr), S = ordering cost (₹/order), H = holding cost (₹/unit·yr), often H = i·P.
  • TC = D·P + (D/Q)·S + (Q/2)·H — total annual cost; at EOQ ordering cost = holding cost and TC* (excl. purchase) = √(2·D·S·H).
  • N = D / Q*, T = Q* / D — orders per year, cycle time.
  • Q_p* = √(2·D·S / (H·(1 − d/p))), I_max = Q·(1 − d/p) — economic production quantity; d = usage rate, p = production rate.
  • ROP = d · L + SS, SS = z · σ_d · √L — reorder point and safety stock; σ_d per period, L in the same periods.

Linear Programming: Graphical and Simplex Methods

  • Max/Min Z = Σ c_j · x_j subject to Σ a_ij · x_j ≤ b_i, x_j ≥ 0.
  • a_i·x + s_i = b_i (slack); a_i·x − e_i + A_i = b_i (surplus + artificial).
  • Leaving variable: minimum of b_i / a_ik over a_ik > 0 (k = entering column).
  • Dual of max cᵀx, Ax ≤ b, x ≥ 0 is min bᵀy, Aᵀy ≥ c, y ≥ 0; at optimum Z* = W*; y_i = shadow price.

Transportation and Assignment Problems

  • Min Z = Σ Σ c_ij · x_ij, Σ_j x_ij = a_i, Σ_i x_ij = b_j — balanced transportation problem.
  • Basic cells in a non-degenerate solution = m + n − 1.
  • u_i + v_j = c_ij (occupied cells), Δ_ij = c_ij − u_i − v_j (empty cells) — MODI; optimal (minimisation) when all Δ_ij ≥ 0.
  • Assignment: x_ij ∈ {0,1}, Σ_j x_ij = 1, Σ_i x_ij = 1; Hungarian method (row and column reduction, cover zeros, adjust).

Network Models: PERT and CPM

  • t_e = (a + 4m + b) / 6, σ² = ((b − a) / 6)² — PERT expected time and variance.
  • T_E = Σ t_e, σ_T² = Σ σ² (critical path only); Z = (T_S − T_E) / σ_T.
  • EF = ES + t, LS = LF − t, TF = LS − ES, FF = min ES(successors) − EF.
  • Cost slope = (C_c − C_n) / (t_n − t_c) — crashing (₹/day).

Queuing Theory: Single-Server Models

  • ρ = λ / μ — utilisation; steady state needs ρ < 1.
  • P₀ = 1 − ρ, P_n = (1 − ρ)·ρⁿ, P(n ≥ k) = ρᵏ.
  • L = λ / (μ − λ) = ρ / (1 − ρ) — average number in system (M/M/1).
  • L_q = λ² / (μ(μ − λ)) = ρ² / (1 − ρ) — average number in queue.
  • W = 1 / (μ − λ), W_q = λ / (μ(μ − λ)) — average time in system and in queue.
  • L = λ·W, L_q = λ·W_q, W = W_q + 1/μ — Little's law.
  • L_q = (λ²σ² + ρ²) / (2(1 − ρ)) — M/G/1 (Pollaczek–Khinchine); M/D/1: L_q = ρ² / (2(1 − ρ)).

Lean Manufacturing, JIT, Kaizen and TPS

  • N = D · T · (1 + α) / C — number of kanbans (round up); D = demand rate, T = replenishment lead time, α = safety factor, C = container size.
  • WIP = TH · LT — Little's law for a production line.
  • PCE = value-adding time / total lead time — process cycle efficiency.
  • Q* ∝ √S — economic batch falls with the square root of setup cost (SMED effect).

Statistical Quality Control and Control Charts

  • X̄ chart: X̿ ± A₂·R̄; R chart: UCL = D₄·R̄, LCL = D₃·R̄ (constants from tables; n = 5: A₂ = 0.577, D₃ = 0, D₄ = 2.114, d₂ = 2.326).
  • X̄ chart with known σ: X̿ ± 3σ/√n.
  • p chart: p̄ ± 3·√(p̄(1 − p̄)/n); c chart: c̄ ± 3·√c̄ (negative LCL → 0).
  • σ̂ = R̄ / d₂.
  • Cp = (USL − LSL) / (6σ), Cpk = min(USL − μ, μ − LSL) / (3σ).

Maintenance Types: Breakdown, Preventive and Predictive

  • MTBF = total operating time / failures = 1/λ; MTTR = total repair time / repairs.
  • A = MTBF / (MTBF + MTTR) — inherent availability.
  • R(t) = e^(−λt) — reliability with constant failure rate.
  • R_series = Π R_i; R_parallel = 1 − Π (1 − R_i).
  • OEE = Availability × Performance × Quality.
  • B_n = N·Σ_(i≤n) p_i + Σ_(k=1)^(n−1) B_k·p_(n−k); cost per period = (N·C_p + B_n·C_b) / n — preventive-maintenance interval selection.

Engine Overhaul, Reconditioning and Testing

  • r = (V_s + V_c) / V_c, V_s = (π/4)·D²·L — compression ratio; swept volume per cylinder.
  • Taper = d_max − d_min along the bore; Ovality = d_thrust − d_axial at one height.
  • ΔV_c ≈ (π/4)·D²·Δt — clearance volume removed by skimming Δt off a flat head/deck.
  • BP = 2π·N·T / 60 — brake power (W); N in rpm, T in N·m.
  • bsfc = ṁ_f / BP; η_bth = BP / (ṁ_f · CV).
  • Morse test: IP_k = BP − BP_(k cut), IP = Σ IP_k, FP = IP − BP, η_m = BP / IP.

Vehicle Diagnostics and Service Station Layout

  • N_bays = ⌈ V · t_s / (H · u) ⌉ — bays required; V = vehicles/day, t_s = standard hours per vehicle, H = working hours, u = bay utilisation.
  • N_tech = ⌈ Σ standard hours / (H_att · p) ⌉ — technicians; p = efficiency × utilisation.
  • FE = d / V_f (km/L); FC = 100·V_f / d (L/100 km).
  • N = 100·(1 − e^(−k·L)) — smoke opacity (%) from absorption coefficient k (m⁻¹) and effective path length L (m).