Production, Maintenance & Industrial Engineering — formula sheet
Automobile Engineering · GATE ME · SI units. Drafted with Aria, checked by the AiCanCode.org team.
Press Shop: Stamping of Body Panels and Die Types
F_max = L · t · τ_s— peak blanking/piercing force (N); L = cut perimeter (mm), t = sheet thickness (mm), τ_s = shear strength (MPa); for a circle L = π·d.c = 0.0032 · t · √τ_s— empirical clearance per side (mm), t in mm, τ_s in MPa. Blanking: die = blank size, punch = blank − 2c. Piercing: punch = hole size, die = hole + 2c.F_shear = F_max · (p · t) / s— peak force with shear s (mm) ground on punch/die; p = fractional penetration at fracture; valid for s ≥ p·t.W = F_max · p · t— shearing work (N·mm); unchanged by shear.D = √(d² + 4·d·h)— blank diameter (mm) for a cylindrical cup of diameter d and height h (thin sheet, sharp corners).F_d = π · d · t · σ_u · (D/d − C)— drawing force (N); σ_u = UTS (MPa); C ≈ 0.6–0.7 (empirical). Limiting draw ratio D/d ≈ 1.8–2.0 for mild steel.
Body Shop: Spot Welding and Robotic Welding Lines
Q = I² · R · t— heat generated (J); I = current (A), R = total resistance (Ω), t = weld time (s). Average powerP = I² · R(W).Q_m = (π/4) · d_n² · h_n · u_m— heat to melt the nugget (J); d_n, h_n = nugget diameter and thickness (mm), u_m = melting energy per unit volume (J/mm³).η = Q_m / Q— thermal efficiency of the weld.T_takt = available time / required output;n_robots = ⌈ N_w · t_w / (T_takt − t_h) ⌉— N_w = welds per station, t_w = time per weld (s), t_h = transfer/clamp time (s).
Paint Shop: Pretreatment, Electrocoating and Topcoat
DFT = WFT · VS— dry film thickness from wet film thickness and volume-solids fraction.V_spray = A · DFT / (VS · TE)— paint volume to spray (m³); A = area (m²), DFT (m), TE = transfer efficiency.SR_th = 10 · VS% / DFT(μm)— theoretical spreading rate (m²/L).m_film = ρ_f · A · t_f;Q_e = m_film / Y— e-coat film mass (kg) and charge (C); Y = coulombic yield (mg/C, supplier data).Q_oven = m_b · c · ΔT— heat to bring the body to bake temperature (J).
Final Assembly Line and Line Balancing
T_takt = T_available / Q— takt time (s/unit).N_min = ⌈ Σt_i / C ⌉— minimum number of stations; C = cycle time (s).η_L = Σt_i / (N · C);d = 1 − η_L— line efficiency and balance delay.SI = √( Σ (S_max − S_k)² )— smoothness index (s).- Production rate = 1 / (largest station time).
Manufacture of Engine Blocks, Crankshafts and Gears
t_s = B · (V / A)²— Chvorinov's rule; t_s = solidification time (s), V/A = modulus (mm), B = mould constant (s/mm²).N = 1000 · V_c / (π · D)— spindle speed (rpm); V_c (m/min), D (mm).T_m = (L + L_a) / (f · N)— machining time (min); f = feed (mm/rev).d = m · Z,d_a = m · (Z + 2),h = 2.25 · m— gear pitch diameter, tip diameter, whole depth (mm).T_hob = (b + L_a) · Z / (f_a · N_h · k)— hobbing time (min); b = face width, f_a = axial feed per work rev, N_h = hob rpm, k = hob starts.
Forecasting Methods for Demand Planning
F_(t+1) = (D_t + … + D_(t−n+1)) / n— simple moving average.F_(t+1) = Σ w_i · D_i,Σ w_i = 1— weighted moving average.F_(t+1) = α · D_t + (1 − α) · F_t— simple exponential smoothing, 0 < α < 1.b = (nΣxy − ΣxΣy) / (nΣx² − (Σx)²),a = (Σy − bΣx) / n— least-squares line D = a + b·x.MAD = Σ|e_t| / n,MSE = Σe_t² / n,TS = Σe_t / MAD— error measures; e_t = D_t − F_t.
Aggregate Planning, MRP and Scheduling
P_level = (Σ D_t + I_end − I_0) / T— level production rate.I_t = I_(t−1) + P_t − D_t— inventory balance.NR_t = max(0, GR_t − OH_(t−1) − SR_t)— MRP net requirement; planned order release = planned receipt offset by lead time;GR_child = POR_parent × q.F_j = Σ p_i,L_j = F_j − d_j,T_j = max(0, L_j)— flow time, lateness, tardiness. SPT minimises mean flow time; EDD minimises maximum lateness; Johnson's rule minimises two-machine makespan.
Inventory Models: EOQ, Quantity Discounts and Safety Stock
Q* = √(2·D·S / H)— EOQ (units); D = annual demand (units/yr), S = ordering cost (₹/order), H = holding cost (₹/unit·yr), often H = i·P.TC = D·P + (D/Q)·S + (Q/2)·H— total annual cost; at EOQ ordering cost = holding cost andTC* (excl. purchase) = √(2·D·S·H).N = D / Q*,T = Q* / D— orders per year, cycle time.Q_p* = √(2·D·S / (H·(1 − d/p))),I_max = Q·(1 − d/p)— economic production quantity; d = usage rate, p = production rate.ROP = d · L + SS,SS = z · σ_d · √L— reorder point and safety stock; σ_d per period, L in the same periods.
Linear Programming: Graphical and Simplex Methods
Max/Min Z = Σ c_j · x_jsubject toΣ a_ij · x_j ≤ b_i,x_j ≥ 0.a_i·x + s_i = b_i(slack);a_i·x − e_i + A_i = b_i(surplus + artificial).- Leaving variable: minimum of
b_i / a_ikover a_ik > 0 (k = entering column). - Dual of
max cᵀx, Ax ≤ b, x ≥ 0ismin bᵀy, Aᵀy ≥ c, y ≥ 0; at optimumZ* = W*; y_i = shadow price.
Transportation and Assignment Problems
Min Z = Σ Σ c_ij · x_ij,Σ_j x_ij = a_i,Σ_i x_ij = b_j— balanced transportation problem.- Basic cells in a non-degenerate solution =
m + n − 1. u_i + v_j = c_ij(occupied cells),Δ_ij = c_ij − u_i − v_j(empty cells) — MODI; optimal (minimisation) when all Δ_ij ≥ 0.- Assignment:
x_ij ∈ {0,1},Σ_j x_ij = 1,Σ_i x_ij = 1; Hungarian method (row and column reduction, cover zeros, adjust).
Network Models: PERT and CPM
t_e = (a + 4m + b) / 6,σ² = ((b − a) / 6)²— PERT expected time and variance.T_E = Σ t_e,σ_T² = Σ σ²(critical path only);Z = (T_S − T_E) / σ_T.EF = ES + t,LS = LF − t,TF = LS − ES,FF = min ES(successors) − EF.Cost slope = (C_c − C_n) / (t_n − t_c)— crashing (₹/day).
Queuing Theory: Single-Server Models
ρ = λ / μ— utilisation; steady state needs ρ < 1.P₀ = 1 − ρ,P_n = (1 − ρ)·ρⁿ,P(n ≥ k) = ρᵏ.L = λ / (μ − λ) = ρ / (1 − ρ)— average number in system (M/M/1).L_q = λ² / (μ(μ − λ)) = ρ² / (1 − ρ)— average number in queue.W = 1 / (μ − λ),W_q = λ / (μ(μ − λ))— average time in system and in queue.L = λ·W,L_q = λ·W_q,W = W_q + 1/μ— Little's law.L_q = (λ²σ² + ρ²) / (2(1 − ρ))— M/G/1 (Pollaczek–Khinchine); M/D/1:L_q = ρ² / (2(1 − ρ)).
Lean Manufacturing, JIT, Kaizen and TPS
N = D · T · (1 + α) / C— number of kanbans (round up); D = demand rate, T = replenishment lead time, α = safety factor, C = container size.WIP = TH · LT— Little's law for a production line.PCE = value-adding time / total lead time— process cycle efficiency.Q* ∝ √S— economic batch falls with the square root of setup cost (SMED effect).
Statistical Quality Control and Control Charts
X̄ chart: X̿ ± A₂·R̄;R chart: UCL = D₄·R̄, LCL = D₃·R̄(constants from tables; n = 5: A₂ = 0.577, D₃ = 0, D₄ = 2.114, d₂ = 2.326).X̄ chart with known σ: X̿ ± 3σ/√n.p chart: p̄ ± 3·√(p̄(1 − p̄)/n);c chart: c̄ ± 3·√c̄(negative LCL → 0).σ̂ = R̄ / d₂.Cp = (USL − LSL) / (6σ),Cpk = min(USL − μ, μ − LSL) / (3σ).
Maintenance Types: Breakdown, Preventive and Predictive
MTBF = total operating time / failures = 1/λ;MTTR = total repair time / repairs.A = MTBF / (MTBF + MTTR)— inherent availability.R(t) = e^(−λt)— reliability with constant failure rate.R_series = Π R_i;R_parallel = 1 − Π (1 − R_i).OEE = Availability × Performance × Quality.B_n = N·Σ_(i≤n) p_i + Σ_(k=1)^(n−1) B_k·p_(n−k); cost per period= (N·C_p + B_n·C_b) / n— preventive-maintenance interval selection.
Engine Overhaul, Reconditioning and Testing
r = (V_s + V_c) / V_c,V_s = (π/4)·D²·L— compression ratio; swept volume per cylinder.Taper = d_max − d_minalong the bore;Ovality = d_thrust − d_axialat one height.ΔV_c ≈ (π/4)·D²·Δt— clearance volume removed by skimming Δt off a flat head/deck.BP = 2π·N·T / 60— brake power (W); N in rpm, T in N·m.bsfc = ṁ_f / BP;η_bth = BP / (ṁ_f · CV).- Morse test:
IP_k = BP − BP_(k cut),IP = Σ IP_k,FP = IP − BP,η_m = BP / IP.
Vehicle Diagnostics and Service Station Layout
N_bays = ⌈ V · t_s / (H · u) ⌉— bays required; V = vehicles/day, t_s = standard hours per vehicle, H = working hours, u = bay utilisation.N_tech = ⌈ Σ standard hours / (H_att · p) ⌉— technicians; p = efficiency × utilisation.FE = d / V_f(km/L);FC = 100·V_f / d(L/100 km).N = 100·(1 − e^(−k·L))— smoke opacity (%) from absorption coefficient k (m⁻¹) and effective path length L (m).